FIELD: nuclear power engineering. SUBSTANCE: method involves presentation of control process as path on phase diagram in offset-equilibrium-offset axes. Equilibrium offset as function of position of absorbing rods is determined before start of reactor run and current values of offset and equilibrium offset are found in the course of reactor operation. Then current point of phase path is constructed on diagram and control action (displacement of rods within reactor core) is set proceeding from position of current point relative to points of equilibrium states and boundary of admissible region on diagram. EFFECT: improved reliability of control. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONTROLLING NUCLEAR POWER PLANT WITH PRESSURISED WATER REACTOR WITH VARIATION OF REACTOR POWER OR EXTERNAL LOAD | 2011 |
|
RU2470391C1 |
DEVICE FOR COMPENSATION OF NUCLEAR REACTOR REACTIVITY AND METHOD OF FLATTENING OF VOLUMETRIC ENERGY DISTRIBUTION AND OF FUEL BURN-UP | 1990 |
|
RU2019875C1 |
METHOD FOR OPERATING RESEARCH REACTOR USING COOLANT OF POSITIVE DENSITY EFFECT REACTIVITY IN TEST CHANNELS | 2005 |
|
RU2302046C2 |
METHOD OF FORMATION OF MAGNETIC FIELD OF QUADRATURE TRAP WITH MAGNETIC WELL | 1992 |
|
RU2008762C1 |
NUCLEAR REACTOR NEUTRON FLUX MONITORING SYSTEM | 2006 |
|
RU2310248C1 |
METHOD FOR CONTROL OF PRESSURIZED WATER NUCLEAR REACTOR AND CORRESPONDING CONTROL SYSTEM | 2019 |
|
RU2792408C1 |
METHOD FOR CORRECTING THE ERROR OF THE READINGS OF THE POWER OF A NUCLEAR REACTOR | 2021 |
|
RU2771891C1 |
METHOD FOR SERVICING NUCLEAR RESEARCH REACTOR | 2005 |
|
RU2292093C2 |
NUCLEAR REACTOR WITH NATURAL CIRCULATION OF HEAT CARRIER | 1989 |
|
RU2025798C1 |
METHOD FOR CONTROLLING AND PROTECTING A FAST NEUTRON NUCLEAR REACTOR AND A SYSTEM FOR ITS IMPLEMENTATION | 2022 |
|
RU2798480C1 |
Authors
Dates
1995-03-10—Published
1992-08-04—Filed