FIELD: railway transport. SUBSTANCE: invention refers to routine maintenance and repair of continuous welded railway track. Process consists in release of equalizing rail from couplings with base and in removal of it. Couplings of rail section to underrail base are loosened over length of rail adjacent to equalizing rail and rail length is released from couplings with underrail base. This length is bent to remove butt-end pressure of rail length on equalizing rail. EFFECT: improved efficiency of release of butt-end pressure.
Authors
Dates
1995-10-10—Published
1992-06-30—Filed