METHOD OF REMOVAL OF DEFECTIVE SECTION OF CONTINUOUS WELDED RAIL LENGTH AND RESTORATION OF ITS INTEGRITY BY WELDING Russian patent published in 2007 - IPC E01B31/18 E01B29/16 E01B29/42 B21K9/00 

Abstract RU 2300601 C1

FIELD: railway transport: permanent way.

SUBSTANCE: proposed method of removal of defective section of continuous welded rail length and restoration of its integrity by welding comes to the following: places of saw cuts in rail length are marked out and clamping forces within the limits of section of rail length to be removed are eliminated, coupling of rail length section to be removed with rail base is reduced, nuts of clamp bolts are turned off and clamps are removed on section of bending length adjoining section of length with reduced coupling with rail base, and rail sliders are installed. Then rail is saw cut in place of location of one of weld joints. Clamping forces in section of rail length to be removed created by deflection of bent section are eliminated, place of second saw cut is marked, distance between saw cuts of rail length are calculated and cut out section of rail length is removed. Rail insert is prepared preliminarily to be fitted into rail length break and is welded to rail length, and temperature conditions of rail length of continuous welded rail is restored adjusting and eliminating preliminarily created deflection, and connection of rail length with rail base is restored.

EFFECT: reduced labor input and summary duration of delay periods for repair of permanent way owing to carrying out all operation simultaneously.

1 dwg

Similar patents RU2300601C1

Title Year Author Number
METHOD FOR REPLACING CLAMPED BUFFER RAILS AND RAILS OF TEMPORARY RECONSTRUCTION OF CONTINUOUS WELDED RAIL TRACK LENGTH (VERSIONS) 2016
  • Shurugin Aleksandr Sergeevich
  • Shangin Ruslan Valerevich
  • Kosenko Sergej Alekseevich
  • Akimov Sergej Sergeevich
  • Starovojt Nikolaj Nikolaevich
RU2643324C1
METHOD FOR REPAIR OF RAILWAY TRACK RAILS WITHOUT THEIR DISMANTLING OFF RAILWAY BED 2008
  • Berzin Mikhail Mikhajlovich
  • Mozhilov Igor' Timofeevich
  • Purekhov Andrej Nikolaevich
RU2364674C1
METHOD OF WELDING RAIL STRINGS FOR CONTINUOUS WELDED RAIL TRACK AND RAIL B EARER FOR METHOD IMPLEMENTATION 2002
  • Zhulev G.G.
RU2230150C2
CONTINUOUS WELDED RAILS LAYING METHOD 1998
  • Ershov V.V.
  • Shabanov L.A.
RU2151833C1
METHOD OF REMOVING THERMAL STRESS IN CONTINUOUS WELDED TRACK RAIL-AND-TIE ASSEMBLY 2011
  • Zhulev Grigorij Georgievich
  • Beljaev Gennadij Petrovich
  • Ovchinnikov Jurij Petrovich
  • Bunin Aleksej Ivanovich
RU2472894C1
0
  • Grishchenko Valerij Aleksandrovich
  • Kosenyuk Vladimir Konstantinovich
  • Syryamin Yurij Nikolaevich
  • Karimov Leonar Rafkatovich
SU1562376A1
PROCESS OF REMOVAL OF EQUALIZING RAIL OF CONTINUOUS WELDED RAILWAY TRACK UNDER BUTT-END PRESSURE 1992
  • Zhulev G.G.
RU2045601C1
METHOD OF WELDING THE LENGTHS OF CONTINUOUSLY WELDED TRACK 0
  • Zhulev Georgij Grigorevich
  • Novakovich Vasilij Ivanovich
SU1043222A1
METHOD OF LAYING CONTINUOUS WELDED RAIL TRACK SLEEPER-AND-RAIL SECTION 2013
  • Zhulev Georgij Grigor'Evich
  • Fedchenko Jurij Ivanovich
RU2541618C1
METHOD FOR RESTORING DESIGNED STRESSED STATE OF RAIL LINK IN JOINTLESS RAIL TRACK 1995
  • Zhulev G.G.
RU2104360C1

RU 2 300 601 C1

Authors

Zhulev Georgij Grigor'Evich

Novakovich Vasilij Ivanovich

Dates

2007-06-10Published

2005-12-01Filed