FIELD: mining. SUBSTANCE: coal deposit is opened, prepared and using column system of development stratums treatment is realized. In the case nuclear reactor is mounted in mine to produce steam. Produce steam is subjected to fire overheating, using produced coal burning. Overheated steam is used for electrical power production and condensed heat carrier is sent back into steam production phase. To realize the method complex of facilities for underground development, that has stationary mine equipment and mine inside used main and auxiliary equipment, are additionally provided with nuclear electrical power plant, located on mine surface or underground under depth of water horizons laying, and with boiler aggregate, located directly near steam generator. Boiler aggregate is link with steam generator by steam pipeline and with steam turbine compartment and outlet of the latter is connected with steam generator of reactor by water pipeline. EFFECT: method allows to increase coal production. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING OF COAL FIELDS AND COMPLEX OF EQUIPMENT FOR ITS EMBODIMENT | 1992 |
|
RU2053356C1 |
METHOD AND COMPLEX FOR EXPLOITATION OF COAL DEPOSITS | 1990 |
|
RU2027854C1 |
ATOMIC POWER PLANT | 1989 |
|
SU1828710A3 |
METHOD FOR MINING COAL DEPOSITS AND COMPLEX OF EQUIPMENT FOR ITS REALIZATION | 1993 |
|
RU2039870C1 |
HYDROELECTRIC PUMPED STORAGE POWER PLANT | 1990 |
|
SU1828711A3 |
PROCESS OF DEVELOPMENT OF COAL SEAMS AND COMPLEX OF EQUIPMENT FOR ITS IMPLEMENTATION | 1990 |
|
SU1836876A3 |
METHOD FOR CENTRALIZED HEATING AND EQUIPMENT WHICH IMPLEMENTS SAID METHOD | 1996 |
|
RU2151964C1 |
UNDERGROUND NUCLEAR HYDRO-ACCUMULATING HEAT ELECTRIC STATION (VERSIONS) | 2017 |
|
RU2643668C1 |
WELL GAS-TURBINE-NUCLEAR OIL-AND-GAS PRODUCING COMPLEX (PLANT) | 2017 |
|
RU2652909C1 |
METHOD OF MINING OF OUTBURST-PRONE AND GASSY COAL SEAMS | 2001 |
|
RU2209315C2 |
Authors
Dates
1995-10-27—Published
1992-06-10—Filed