FIELD: atomic power engineering. SUBSTANCE: nuclear reactor with steam generators is provided with hydraulic turbine with electric generator and is installed underground at predetermined lower geodetic level. Water steam from steam generators is fed over steam pipe-line to steam turbine with electric generator which is mounted on substantially higher geodetic level as compared with lower one. Waste water and condensed steam after steam turbine are fed over water conduit-pipe-line to hydraulic turbine and further on again to steam generators of nuclear reactor. EFFECT: enhanced operational efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND FACILITIES TO REALIZE COAL STRATUMS UNDERGROUND DEVELOPMENT | 1992 |
|
RU2046949C1 |
HYDROELECTRIC PUMPED STORAGE POWER PLANT | 1990 |
|
SU1828711A3 |
UNDERGROUND NUCLEAR HYDRO-ACCUMULATING HEAT ELECTRIC STATION (VERSIONS) | 2017 |
|
RU2643668C1 |
METHOD AND COMPLEX FOR EXPLOITATION OF COAL DEPOSITS | 1990 |
|
RU2027854C1 |
METHOD FOR MINING OF COAL FIELDS AND COMPLEX OF EQUIPMENT FOR ITS EMBODIMENT | 1992 |
|
RU2053356C1 |
REACTOR PLANT EMERGENCY COOLING DEVICE | 2017 |
|
RU2649408C1 |
SYSTEM FOR SAFE USE OF HYDROGEN WHILE INCREASING POWER OF DOUBLE-CIRCUIT NPP ABOVE NOMINAL | 2019 |
|
RU2736603C1 |
DUAL LOOP DEEP NUCLEAR POWER SYSTEM | 2023 |
|
RU2813198C1 |
STEAM-GAS UNIT OF TWO-CIRCUIT NUCLEAR POWER PLANT | 2014 |
|
RU2547828C1 |
CYCLING NUCLEAR POWER PLANT | 2010 |
|
RU2453938C1 |
Authors
Dates
1994-12-30—Published
1989-11-13—Filed