FIELD: mining industry. SUBSTANCE: in developing second order chambers, they are located in primary pillars and mining is effected after filling worked-out area of primary chambers with rock matter of deformed primary and inter-chamber pillars and with rock matter of crushed immediate roof and foot. This is done after stopped rock acquires sufficient strength and compression properties under action of rock pressure, and expected period of compressed rock mass acquiring sufficient strength and compression properties is determined by comparing final setting of ground surface at applied parameters of performing stoping operations at initial stage according to chart of increased setting of ground surface in zone of full development. EFFECT: high efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SECONDARY TREATMENT OF SALT BED | 2011 |
|
RU2468206C1 |
METHOD OF ROOF CONTROL IN FLAT POTASSIUM SEAMS | 1994 |
|
RU2074960C1 |
METHOD OF MINING FLAT SEAMS AT ROOF CONTROL ON BAND PILLARS | 1994 |
|
RU2074959C1 |
METHOD FOR CONTROL OF ROCK PRESSURE | 1989 |
|
RU2014453C1 |
METHOD FOR REDUCING DEFORMATION OF WATER-PROTECTIVE MASS AND GROUND SURFACE | 1996 |
|
RU2118455C1 |
METHOD FOR EXTRACTING A BED OF SHALE | 2005 |
|
RU2287686C1 |
METHOD FOR DEVELOPMENT OF FLAT POTASSIUM SEAMS IN CHAMBERS | 1995 |
|
RU2083828C1 |
METHOD FOR CONTROL OF ROCK PRESSURE | 1995 |
|
RU2081316C1 |
METHOD FOR MINING THICK SEAMS OF POTASSIUM-MAGNESIUM SALTS | 1996 |
|
RU2110687C1 |
METHOD OF HYDRAULIC LAYING OF WORKED SPACE IN MINING COAL BEDS | 0 |
|
SU1763661A1 |
Authors
Dates
1997-07-10—Published
1995-08-16—Filed