FIELD: railway transport; maintenance and repair of permanent way. SUBSTANCE: machine has frame resting on running bogies, suction device with suction branch pipe and device for transportation of crushed stone to suction branch pipe consisting of horizontal beam with guide rollers on ends and endless chain passed over guide rollers. Crushed stone transportation device is mounted on frame for re-placing in height and turning around vertical axis by drives. Suction branch pipe is installed for re-placing in height and arrangement in zone of tie end face. Vertical axis of turning of crushed stone transportation device is connected with one of end sections of horizontally arranged beam. Suction branch pipe is arranged above turning zone of crushed stone transportation device. EFFECT: enlarged operating capabilities. 14 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BALLASTING MACHINE | 1996 |
|
RU2112101C1 |
CRUSHED-STONE SPREADING MACHINE | 1994 |
|
RU2087612C1 |
METHOD FOR SPREADING AND PLANING THE RUBBLE BALLAST OF RAILWAY TRACK | 1991 |
|
RU2048628C1 |
DEVICE FOR TREATMENT OF CRUSHED STONE OF RAIL TRACK | 1994 |
|
RU2087611C1 |
TRACK LAYING BALLAST EXTRUDING MACHINE | 1997 |
|
RU2124087C1 |
RAILWAY TRACK BALLAST CLEANER | 1992 |
|
RU2022074C1 |
METHOD AND TIE TAMPER FOR COMPACTING RAILWAY TRACK RUBBLE | 1992 |
|
RU2048630C1 |
DEVICE FOR PICKING-UP, ACCUMULATION AND DISTRIBUTION OF TRACK LARGE BALLAST | 1992 |
|
RU2030500C1 |
METHOD OF AND DEVICE FOR RECONDITIONING OF RAILWAY TRACK BALLAST LAYER | 1994 |
|
RU2086723C1 |
MACHINE FOR DISMANTLING OLD RAILWAY TRACK AND LAYING NEW TRACK | 1996 |
|
RU2110636C1 |
Authors
Dates
1997-08-20—Published
1994-01-26—Filed