FIELD: track structure, mainly, of opencast railroad. SUBSTANCE: the offered reinforced concrete base has tie with central socket in underrail platform, locking member located in mentioned above socket and tie plate installed on underrail platform. Locking member is formed by bushing embedded in concrete in the socket and pin installed in bushing in a spaced relation to bushing vertical walls. Tie plate has hole coaxial to the socket, and hole accommodates end of pin protruding out of bushing. Pin end face forms gap together with foot of installed rail. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
INTERMEDIATE FASTENING OF RAIL | 2001 |
|
RU2226232C2 |
INTERMEDIATE RAIL JOINT | 1992 |
|
RU2047678C1 |
INTERMEDIATE RAIL FASTENING | 2004 |
|
RU2257438C1 |
RAIL FASTENING | 2016 |
|
RU2624765C1 |
INTERMEDIATE RAIL FASTENER ON REINFORCED CONCRETE BASE | 2002 |
|
RU2205258C1 |
INTERMEDIATE RAIL FASTENING | 2023 |
|
RU2805596C1 |
REINFORCED CONCRETE BASEPLATE | 1990 |
|
RU2112097C1 |
TRACK FOR BRIDGES AND TUNNELS | 2009 |
|
RU2415987C2 |
INTERMEDIATE SEPARATE RAIL FASTENING FOR HIGH-SPEED RAILWAY LINES | 2002 |
|
RU2221099C2 |
ANCHOR RAIL FASTENING | 2004 |
|
RU2267569C1 |
Authors
Dates
1997-09-27—Published
1992-11-11—Filed