FIELD: agriculture and forestry, particular, elimination of gullies, mainly, at banks of water basin with varying water level. SUBSTANCE: the offered method includes erection of dam to form pool-settler with sediments before dam. After accumulation of sediments, a dam is erected which is located partially on the crest of the previous dam, and partially, on sediments of previous dam to form before next a pool with sediments. After accumulation of sediments before the last small dam, next dam is erected using the same method. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BANK CONSOLIDATION | 2001 |
|
RU2224065C2 |
DAM | 1997 |
|
RU2123556C1 |
METHOD FOR ERECTING EARTHFILL DAM | 2000 |
|
RU2180934C2 |
METHOD OF EARTH DAM CONSTRUCTION | 1998 |
|
RU2145372C1 |
POLYCONIC GULLY STRENGTHENING METHOD | 1994 |
|
RU2113776C1 |
EARTH DAM WITH FROZEN GROUND CURTAIN IN ITS BODY AND BASE | 1996 |
|
RU2153555C2 |
METHOD FOR DISPOSAL OF ENTERPRISE GRAIN WASTES WITHIN AREA OCCUPIED BY LONG TIME WASTE-STORAGE POND | 1997 |
|
RU2160339C2 |
DEVICE FOR HYDRAULIC STORING OF GRAINY WASTES | 1995 |
|
RU2087616C1 |
GULLY TWO-STAGE SLURRY DUMP FOR GRANULAR INDUSTRIAL WASTE | 2004 |
|
RU2275458C1 |
PROCESS OF REPAIR OF MULTISECTIONAL CONCRETE DAM | 2000 |
|
RU2200220C2 |
Authors
Dates
1997-09-27—Published
1995-09-13—Filed