FIELD: railway track repair and maintenance equipment. SUBSTANCE: device for repair of ballast prism of railway track has first group of machines: crushed-stone removing machine with power-driven operating chain, crushed-stone cleaning machine, rail lifting unit and belt conveyer, crushed-stone producing machine with stone crusher and collecting platform, and second group of machines: crushed-stone removing machine with power-driven operating chain, belt conveyer and collecting platform, and third group of machines: machine for creating protective course and collecting platform. According to method, old crushed-stone is removed in two stages. After removing each layer, placed on remaining layer of old crushed-stone or ground bed is railway track which is then lifted before subsequent removing of old crushed stone and before placing protective layer material. First layer of old crushed-stone after its removal is crushed and collected for further use as material for protective layer. EFFECT: high efficiency. 6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF AND DEVICE FOR RECONDITIONING OF RAILWAY TRACK BALLAST LAYER | 1994 |
|
RU2086723C1 |
DEVICE FOR RECOVERING BALLAST LAYER BASE OF RAILWAY TRACK | 1995 |
|
RU2106451C1 |
BALLASTING MACHINE | 1996 |
|
RU2112101C1 |
TRACK LAYING BALLAST EXTRUDING MACHINE | 1997 |
|
RU2124087C1 |
MACHINE FOR TREATING BALLAST COURSE OR GROUND BASE OF RAILWAY TRACK | 1994 |
|
RU2093632C1 |
METHOD FOR SPREADING AND PLANING THE RUBBLE BALLAST OF RAILWAY TRACK | 1991 |
|
RU2048628C1 |
DEVICE FOR TREATMENT OF CRUSHED STONE OF RAIL TRACK | 1994 |
|
RU2087611C1 |
TRACK-LAYING MACHINE FOR REMOVING BALLAST MATERIAL | 1997 |
|
RU2119001C1 |
METHOD AND MACHINE FOR STABILIZATION OF GROUND BASE FOR RAILWAY TRACK | 1994 |
|
RU2093631C1 |
RAIL TRACK RECONSTRUCTION MACHINE | 2001 |
|
RU2225472C2 |
Authors
Dates
1998-01-20—Published
1995-11-01—Filed