FIELD: mining industry. SUBSTANCE: according to method, underground workings are driven, and split trench is located in lower part of mineral deposit, and development workings are arranged through mineral at seam roof. Braking planes are formed as inclined, and site for displacing block is created from rock matter with incline angle of its surface which exceeds descending angle of seam. EFFECT: higher efficiency. 4 dwg
Authors
Dates
1998-02-20—Published
1995-08-08—Filed