FIELD: railway repair and maintenance technology. SUBSTANCE: according to method, tamping of ballast is performed under two groups of sleepers. Each group consists of two sleepers and located between them is one or two sleepers. Simultaneously with tamping ballast under aforesaid two groups of sleepers, railway track itself is raised to required position. Ballast under aforesaid one or two sleepers is tampered independently from tamping ballast under two groups of sleepers. With that, preset position of railway track remains unchanged and this allows for ensuring high productivity of tamping ballast under sleepers and keeping accuracy in adjusting position of railway track for long period of time. EFFECT: higher efficiency. 3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
TIE TAMPER, ITS ARRANGEMENT AND METHOD OF TIE TAMPING | 1996 |
|
RU2124088C1 |
BALLAST TAMPING MACHINE | 1996 |
|
RU2110635C1 |
METHOD FOR BALLASTING AND STABILIZATION OF RAIL TRACK | 1996 |
|
RU2143512C1 |
SLEEPER PADDING MACHINE AND METHOD OF RAIL TRACK PADDING | 1994 |
|
RU2082847C1 |
TIE-TAMPING OUTFIT | 1998 |
|
RU2158796C2 |
TRACK-PACKING MACHINE FOR SWITCHES AND RAILROAD CROSSINGS | 1993 |
|
RU2062858C1 |
TRACK POSITION ADJUSTMENT METHOD | 1999 |
|
RU2187593C2 |
MOBILE MACHINE FOR SPORT SURFACING OF TRACK, TAMPING AND FINISHING | 0 |
|
SU1804521A3 |
OPERATING TRANSPORT FACILITY FOR PERFORMING RAILWAY REPAIRS | 1996 |
|
RU2109101C1 |
TIE-TAMPING UNIT OF TIE TAMPER | 1995 |
|
RU2100513C1 |
Authors
Dates
1998-07-10—Published
1996-03-06—Filed