FIELD: construction; methods and devices for stabilization or reconditioning of damaged pavement. SUBSTANCE: method includes removal of upper layer of pavement by milling cutter, grinding of removed material at site and placed again. Added to produced material is binding agent from cement, cement mortar, water and/or bitumen emulsion and/or preliminarily prepared mixture of additives, and/or mineral components with preset sizes of particles and their volume, and reconditioned in this way material is placed into roadbed. EFFECT: processing of material at site, saving in building materials. 18 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
RECIRCULATION COMBINE ASPHALT ROAD COATING | 2013 |
|
RU2522363C1 |
METHOD OF THE ASPHALT CONCRETE ROAD PAVEMENT PATCHING AND ROAD MACHINE FOR ITS IMPLEMENTATION | 2017 |
|
RU2664279C2 |
METHOD FOR USE OF MEGALOPOLIS HIGHWAY | 1998 |
|
RU2140479C1 |
METHOD OF RECONDITIONING OF ROAD PAVEMENT LAYERS | 2004 |
|
RU2271415C1 |
ROAD COVERING REPAIR METHOD AND ROAD REPAIR UNIT | 2017 |
|
RU2674483C1 |
METHOD FOR PAVEMENT REPAIR | 1998 |
|
RU2119466C1 |
METHOD FOR COLD REGENERATION OF ASPHALT AND CONCRETE PAVEMENT LAYERS | 2010 |
|
RU2441961C2 |
METHOD OF REGENERATING LAYERS OF ROAD COATING (VARIANTS) | 2003 |
|
RU2232841C1 |
MOTOR ROAD AND METHOD OF ITS OPERATION TOGETHER WITH REPAIR AND RECONSTRUCTION | 1998 |
|
RU2135671C1 |
METHOD OF ROAD DRESSING RECOVERY | 2007 |
|
RU2341610C1 |
Authors
Dates
1998-11-27—Published
1993-07-12—Filed