FIELD: construction engineering. SUBSTANCE: this can be used for stabilizing properties of loess and other subsiding grounds by eliminating subsidence with possible moistening by injecting special solutions into ground. According to method, fractures are made in ground by way of hydraulic fracturing through creation of closed system "receiver-working vessel" and subsequent establishing initial pressure in it and instantaneous transmitting this pressure to injectors at simultaneous introduction into ground at given velocity of stabilizing suspension or hardening solution. After that, ground mass is subjected to pressing by applying pressure of value close to initial. Application of aforesaid method simplifies process of injecting suspension or hardening solution due to establishing pressure for hydraulic fracturing in ground mass in process of injecting. In addition, uncontrolled leakage of suspension and solution is reduced, and quality of ground compaction is improved. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING BEARING CAPACITY OF GEOTECHNOGENIC SYSTEMS | 1997 |
|
RU2130992C1 |
METHOD OF MAKING CAST-IN-PLACE PILES | 1995 |
|
RU2103443C1 |
METHOD FOR ERECTING BUILDINGS AND STRUCTURES ON IRREGULARLY COMPRESSIBLE GROUNDS | 1998 |
|
RU2169238C2 |
METHOD FOR CONSOLIDATION GROUTING IN FOUNDATION OF DEFORMED BUILDINGS AND STRUCTURES | 1999 |
|
RU2162917C2 |
FOUNDATION PREPARATION METHOD | 2008 |
|
RU2380482C1 |
HEAT-INSULATED FOUNDATION | 1998 |
|
RU2135693C1 |
METHOD FOR COMPACTION OF LOESSIAL SOILS IN BASES OF BUILDINGS AND STRUCTURES | 1991 |
|
RU2015247C1 |
METHOD OF DETOXIFYING TOXIC WASTES | 1995 |
|
RU2104809C1 |
PROCESS OF PREPARATION OF FOUNDATIONS | 1995 |
|
RU2122068C1 |
METHOD FOR CONSTRUCTION OF GROUND BASE | 1996 |
|
RU2119008C1 |
Authors
Dates
1998-12-27—Published
1997-02-04—Filed