FIELD: erection of underground reservoirs; underground storages for liquids and industrial wastes. SUBSTANCE: wells are drilled at inclination relative to central portion of reservoir. Wellhead is formed over upper contour of reservoir. Then soil is washed off and washed-off zone is filled with hardening solution, after which inclined retaining wall is erected and soil is withdrawn from reservoir. EFFECT: reduced consumption of binding solution due to reduced thickness of underground reservoir wall at enhanced stability. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
BUILDING METHOD OF WATERTIGHT SCREEN IN BUILT-UP AREAS | 2007 |
|
RU2349710C1 |
METHOD OF EXTINGUISHMENT OF LOCAL PEAT FIRE COMBUSTION SOURCES | 2016 |
|
RU2640178C2 |
METHOD FOR UNDERGROUND HYDRO MINING OF MINERALS AND THE DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2763162C1 |
METHOD FOR CONSTRUCTION OF VERTICAL DRAINAGE | 1994 |
|
RU2074925C1 |
METHOD OF LEVELLING EDIFICES CONSTRUCTIONS | 1991 |
|
RU2013495C1 |
METHOD FOR CONSTRUCTION OF MINE SHAFTS IN WATERED UNSTABLE ROCKS | 1990 |
|
RU2095574C1 |
METHOD FOR DRIVING TUNNELS IN UNSTABLE WATER-SATURATED ROCKS | 1992 |
|
RU2043501C1 |
METHOD FOR STRUCTURE ERECTION ON WEAK SOILS IN SURFACE AREA OF BODIES OF WATER | 2015 |
|
RU2592004C1 |
METHOD FOR BORE-HOLE HYDRAULIC MINING OF SOLID MINERALS | 1998 |
|
RU2125160C1 |
HYDRAULIC BOREHOLE MINING OF HARD MINERALS | 2012 |
|
RU2517728C1 |
Authors
Dates
1999-11-20—Published
1997-08-26—Filed