FIELD: construction engineering. SUBSTANCE: method relates to transporting technological equipment on sea platform and for pulling sea platform to shore. For transporting of sea platform, installed under its bottom are two groups of inflatable sheathings which are alternately rested to bottom of platform. At resting of first group of inflatable sheathings on platform bottom, platform by means of platform drawworks which is connected by rope to anchor secured on shore is pulled up to determined value. Then, second group of inflatable sheathings is lowered down, and first group of inflatable sheathings is raised, and pulling-up of platform is repeated. These cycles are repeated until sea platform is located on shore. Application of aforesaid method allows for bringing sea platform onto non-prepared shore. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TRANSFER OF CARGOES AMONG MOBILE FLOATING OBJECTS | 1991 |
|
RU2046731C1 |
POINT BERTH | 1992 |
|
RU2068791C1 |
DEVICE FOR DELIVERY OF SUBMERSIBLE OBJECTS TO SEA BOTTOM | 1993 |
|
RU2088472C1 |
SHIP MOVEMENT METHOD | 2018 |
|
RU2679702C1 |
DRUM FOR TRANSPORTING BY FLOATING AND LAYING PIPELINE | 0 |
|
SU769172A1 |
METHOD OF ANCHOR POSITIONING OF SHIP | 1992 |
|
RU2045441C1 |
METHOD FOR MOUNTING SEA-BASED ICE-PROOF PLATFORM AND A DEVICE TO IMPLEMENT IT | 1991 |
|
RU2036268C1 |
METHOD OF USAGE OF SEA ICE-RESISTANT PLATFORM | 1994 |
|
RU2076919C1 |
ARRANGEMENT FOR MOVING A PLOUGH FOR WORKING UNDERWATER TRENCHES | 0 |
|
SU1244244A1 |
UNLOADING PONTOON | 1992 |
|
RU2079031C1 |
Authors
Dates
2000-01-10—Published
1998-02-10—Filed