FIELD: construction engineering. SUBSTANCE: method used in repairing concrete and asphalt-concrete roads under winter and bad weather conditions involves cleaning pot-holes and laying claydite into them at temperature of 200- 300 C. After claydite is cooled down below 100 C, it is consolidated and cement-sand mortar is injected into it, then it is allowed to acquire desired strength using method of thermos . Proposed method provides for conducting concrete and asphalt-concrete works during any season, ensures high quality of concrete and mechanical endurance of pavement, reduced power requirement for heating frozen base due to heat of cooling claydite. EFFECT: enlarged functional capabilities. 1 ex, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WINTER CONCRETING - "DRY HOT THERMOS" | 2000 |
|
RU2164867C1 |
METHOD OF PRODUCTION OF THREE-LAYER GUARDING CLAYDITE-CONCRETE PANEL | 2002 |
|
RU2215649C1 |
METHOD FOR ROAD BED REPAIR WITHOUT ROAD COVERING DAMAGE | 2004 |
|
RU2265102C1 |
METHOD OF REPAIR OF ROAD SURFACING | 2007 |
|
RU2338027C1 |
METHOD OF PREPACKED CONCRETING | 2017 |
|
RU2658737C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
METHOD FOR PREPARING CLAYDITE-CONCRETE MIXTURE | 2001 |
|
RU2206542C2 |
METHOD FOR USE OF MEGALOPOLIS HIGHWAY | 1998 |
|
RU2140479C1 |
MOTOR ROAD AND METHOD OF ITS OPERATION TOGETHER WITH REPAIR AND RECONSTRUCTION | 1998 |
|
RU2135671C1 |
METHOD FOR PREPARING EXPANDED-CLAY LIGHTWEIGHT CONCRETE MIX | 0 |
|
SU1668341A1 |
Authors
Dates
2001-07-27—Published
2000-02-10—Filed