FIELD: mining industry; applicable in storage of salt-slime wastes in workings of potassium mines. SUBSTANCE: method includes driving of chambers in stable brine- and water-impermeable rocks surrounding working horizons with leaving of interchamber pillars; driving of air haulage headings connected with chambers by inclines. Floor of air and haulage headings are located above pressure arch formed in possible caving of roof rocks into chambers. EFFECT: higher degree of fullness of chambers due to full use of their volumes. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATION OF UNDERGROUND TOXIC WASTE STORAGE IN SALT-BEARING ROCK MASS | 1997 |
|
RU2132467C1 |
DISPOSAL OF POTASSIUM CONCENTRATION WASTES | 2013 |
|
RU2522120C1 |
METHOD FOR BURYING TOXIC WASTE IN MINE WORKINGS | 1996 |
|
RU2118459C1 |
METHOD OF UNDERGROUND STORAGE OF SALT AND SLIME WASTE | 0 |
|
SU1058836A1 |
METHOD FOR MINING THICK SEAMS OF POTASSIUM-MAGNESIUM SALTS | 1996 |
|
RU2110687C1 |
METHOD FOR CREATING UNDERGROUND REPOSITORIES OF TOXIC WASTES IN SALT-BEARING ROCKS | 1993 |
|
RU2066770C1 |
METHOD FOR CHAMBER MINING WHEN PREPARING HORIZONS | 2016 |
|
RU2627803C1 |
METHOD FOR PREPARATION OF EXCAVATION SITE AT CHAMBER DEVELOPMENT SYSTEM | 2015 |
|
RU2577570C1 |
METHOD OF MINING INCLINED ORE DEPOSITS | 0 |
|
SU734420A1 |
METHOD FOR PREPARATION OF BEDDED DEPOSITS TO REVERSE ORDER OF MINING WHEN IMMEDIATE ROOF ROCK IS UNSTABLE | 2009 |
|
RU2398965C1 |
Authors
Dates
2001-04-27—Published
1999-01-05—Filed