FIELD: oil and gas production; applicable in operation of development wells. SUBSTANCE: method includes checking of flow area value of tubing string in presence of minimal circulation through it; step change of maximum size in cross-section of rotating heads with cutting members of cleaning device. This size is brought to value not exceeding the size of tool of tubing string gagging. Cleaning is carried out by axial motion of cleaning device. EFFECT: provided maximum possible production rate of wells of one ore other parts of deposit or entire deposit. 15 cl, 2 dwg
Authors
Dates
2001-06-10—Published
2000-10-19—Filed