FIELD: oil and gas producing industry; cleaning pipes from asphalt-gum-paraffin deposits. SUBSTANCE: proposed method includes heating the pipes to temperature exceeding melting point of asphalt-gum-paraffin deposits by feeding the thermal radiation carrier to surface of pipes followed by removal of molten products. Prior to cleaning the pipes they are laid in bank; used as thermal radiation carrier is air flow at temperature not below 200 C and linear velocity of no less than 30 m/s; air source is arranged on side of one of ends of pipe bank, coaxially relative to it. Air flow used as thermal radiation carrier is formed as pulses at duration not exceeding 0.5 s. EFFECT: increased productivity; enhanced efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CLEANING INNER SURFACES OF OIL AND GAS PIPES FROM ASPHALTENE-RESIN-PARAFFIN DEPOSITS | 2004 |
|
RU2288788C2 |
DEVICE FOR CLEANING TUBES OF ASPHALT-TAR-PARAFFIN SEDIMENTS | 2010 |
|
RU2437726C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
METHOD FOR CONTROL OF ASPHALT-RESIN-PARAFFIN DEPOSITS FORMATION IN LIFT PIPES DURING GASLIFT OPERATION OF WELLS | 2021 |
|
RU2755778C1 |
METHOD AND DEVICE FOR CLEANING PIPES FROM ASPHALT-RESIN-PARAFFIN DEPOSITIONS | 1996 |
|
RU2124117C1 |
METHOD FOR ASPHALT-TAR-PARAFFIN DEPOSITS PREVENTION IN OIL PRODUCTION EQUIPMENT | 2005 |
|
RU2298642C1 |
METHOD OF PREVENTING FORMATION OF ASPHALTENE, RESINOUS PARAFFIN DEPOSITS (ARPD) IN LIFT PIPES DURING GAS-LIFT OPERATION OF OIL WELLS | 2020 |
|
RU2740462C1 |
METHOD FOR CONTROLLNG ASPHALT-RESIN-PARAFFIN DEPOSITS IN OILFIELD EQUIPMENT | 2021 |
|
RU2779242C1 |
COMBINED METHOD FOR TUBING CLEANING AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2627520C1 |
METHOD FOR CLEANOUT OF TUBING STRING CAVITY FROM ASPHALT, RESIN AND PARAFFIN DEPOSITS | 2013 |
|
RU2540594C1 |
Authors
Dates
2001-06-27—Published
2000-06-20—Filed