FIELD: metallurgy, namely reconstruction and repairing of blast furnace casings. SUBSTANCE: method comprises steps of shutdown of blast furnace, demounting its main units, manufacture of new casing, mounting inside furnace suspended platforms, assembling new units and mounting them along height of furnace. Bed for assembling lower part of shaft and bosh extension is rested upon suspended platform and bearing structure of blast furnace. Before mounting lower portion of shaft and bosh extension, above mentioned bed is demounted and new crown is mounted at successively placing its both halves. Mounting beam is used for mounting lower portion of shaft, bosh extension and parts of new crown of furnace. EFFECT: lowered labor consumption at repairing works, enhanced operational reliability of blast furnace. 3 dwg,1 ex
Title | Year | Author | Number |
---|---|---|---|
BLAST FURNACE REVAMPING METHOD | 0 |
|
SU1765333A1 |
PLATFORM FOR CARRYING OUT INSIDE BLAST FURNACE | 1991 |
|
RU2031127C1 |
METHOD FOR RECOVERY REPAIR OF BLAST FURNACE SHAFT COOLING SYSTEM | 2000 |
|
RU2170768C1 |
STAGE FOR PERFORMING WORK INSIDE BLAST FURNACE | 0 |
|
SU1747624A1 |
METHOD FOR BLOWING-IN OF BLAST FURNACE | 2002 |
|
RU2235788C2 |
FIXTURE FOR MOUNTING OF CRANES-RELOADERS OF TUBULAR-BEAM CONSTRUCTION | 1996 |
|
RU2112121C1 |
METHOD FOR CONTROLLING BLAST FURNACE OPERATION | 1999 |
|
RU2167202C1 |
METHOD OF MANUFACTURING SHAFT OF BLAST FURNACE | 1995 |
|
RU2109818C1 |
METHOD FOR PROCESSING OF SLAG DISCHARGED FROM BLAST FURNACE | 2002 |
|
RU2215042C1 |
BLAST-FURNACE METHOD | 2000 |
|
RU2184152C1 |