FIELD: mining industry, underground working of coal seams. SUBSTANCE: system of working of gently dipping coal seams includes excavation of coal by breakage face, support of roof by installation of row of powered pillars and their subsequent advance. Breakage face is moved perpendicular to frontal line of row of powered pillars. In this case length of face, length of powered pillars and spacing of their shifting are assumed to be equal to spacing of main roof. EFFECT: raised operational safety and efficiency of control over roof. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM OF EXPLOITATION OF GENTLY DIPPING SEAMS | 2000 |
|
RU2179638C1 |
METHOD FOR FLAT-LAYING COAL SEAM DEVELOPMENT | 2004 |
|
RU2273733C1 |
METHOD OF CONTROLLING ROOF IN LONGWALL FACE | 0 |
|
SU1578337A1 |
METHOD FOR EXTRACTING THICK INCLINED COAL FORMATION BY COLUMN-CHAMBERS | 2005 |
|
RU2295037C1 |
METHOD FOR GAS-LADEN FLAT-LAYING COAL SEAM MINING | 2005 |
|
RU2301892C1 |
GENTLY SLOPING COAL BED MINING METHOD | 2005 |
|
RU2284414C1 |
METHOD OF EXCAVATION OF THICK FLAT COAL BEDS | 2014 |
|
RU2563003C1 |
METHOD OF ROOF CONTROL IN MINING OF GENTLY-SLOPING STRATA OF MINERALS | 0 |
|
SU1548441A1 |
METHOD FOR THICK ORE DEPOSIT DEVELOPMENT | 2006 |
|
RU2310753C2 |
UNDERGROUND MINING METHOD | 2003 |
|
RU2269003C2 |
Authors
Dates
2002-02-27—Published
2000-06-08—Filed