FIELD: plant production of large-sized construction for covering of buildings and structures. SUBSTANCE: the method consists in molding of cantilever arts and transverse ribs by a plasticized lightweight concrete mix with a growing load and temperature in containers, to which ballast liquid or water at a temperature of 85 to 95 C is fed, after that the tension of stressed reinforcement is accomplished, and the slab span is molded in the upper parts of the cantilever ribs with a plasticized mix of high-strength concrete with employment of surface vibrators. The device for realizing the method in the span is made in the form of a shell with a flat bottom of a parabolic contour connected to arched moulds for ribs by brackets, and the containers are made in the form of molding vessels with a bottom of an elliptic contour with perforated flaps over the entire length of the cantilever ribs, whose end face walls are additionally provided with eyes for passage of the stressed reinforcement and fixing of the mould- shaping vessels. EFFECT: expanded capacity of manufacture of large-sized products, reduced specific consumption of materials. 6 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
ARCHED DOUBLE-CANTILEVER SLAB-VAULT | 2000 |
|
RU2181822C1 |
SANDWICH SLAB OF LOW VAULTS AND METHOD FOR ITS MANUFACTURE | 2000 |
|
RU2184195C1 |
COMPOSITE LOW VAULT STRUCTURE AND VAULT ERECTION METHOD | 2003 |
|
RU2254424C1 |
LAMINATED PANEL OF VENTILATED WALL FENCE | 2002 |
|
RU2221119C1 |
LAMINATED BUILDING UNIT OF REINFORCED WOOD AND METHOD OF ITS PRODUCTION | 2002 |
|
RU2237138C1 |
METHOD FOR MAKING LAMINATE BUILDING PRODUCTS | 0 |
|
SU1060599A1 |
LINE FOR MANUFACTURING OF ENLARGED WALL ELEMENTS AND WALL HEAT-SAVING FENCING OF BUILDINGS PRODUCED ON THIS LINE | 2008 |
|
RU2398677C2 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD FOR TEMPORARY SPAN STRUCTURE SECURING DURING ASSEMBLAGE THEREOF WITH THE USE OF TEMPORARY STRESSED HIGH-STRENGTH REINFORCEMENT BUNDLES | 2004 |
|
RU2249067C1 |
SUSPENDED FERROCONCRETE SHELL AND METHOD OF ERECTING SAME | 0 |
|
SU1546583A1 |
Authors
Dates
2002-06-10—Published
2000-10-06—Filed