FIELD: hydrometallurgy, namely processes for extracting useful components at using continuous autoclave oxidation leaching of metals. SUBSTANCE: method comprises steps of preparing ore material by disintegration; continuously making initial pulp; leaching pulp in autoclave under increased oxygen pressure at forced displacement of pulp volume; settling useful components. Novelty is preparation of initial pulp at continuously feeding oxygen-saturated water under pressure exceeding pressure in autoclave onto supplied prepared ore material. Water is guided onto continuously fed prepared ore material in direction of pulp displacement at leaching in autoclave under pressure exceeding by 1.5 - 2 times pressure in autoclave. EFFECT: enhanced efficiency. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
CONTINUOUS AUTOCLAVE FOR METAL OXIDIZING LEACHING | 2000 |
|
RU2171709C1 |
METHOD FOR DECONTAMINATING COOLING POND POLLUTED BY RADIONUCLIDES | 2001 |
|
RU2210823C2 |
PROCESS OF ELECTRON-PLASMA DEPOSITION OF METAL COATS | 2002 |
|
RU2218449C1 |
MIXTURE TO PRODUCE CARBON-CARRYING BRIQUETTES | 2002 |
|
RU2202633C1 |
METHOD FOR CLEANING WATER RESERVOIR FROM RADIOACTIVE ISOTOPES | 2001 |
|
RU2203511C2 |
WAY TO FORM SCREEN | 2001 |
|
RU2213178C2 |
METHOD OF SOLID DOMESTIC WASTE CYCLIC INCINERATION | 2001 |
|
RU2221197C2 |
MAGNETIC SYSTEM OF DRUM SEPARATOR | 2001 |
|
RU2213623C2 |
ROLLING STAND | 2001 |
|
RU2204448C2 |
PERMEABLE LAYER OF ANTIFILTERING DEVICE | 2001 |
|
RU2226587C2 |
Authors
Dates
2003-02-27—Published
2001-09-12—Filed