FIELD: construction industry, metal structures of industrial buildings. SUBSTANCE: column includes outer branch and branch under crane. Each branch is linked to lateral overhanging beams oriented in plane of moment of action. Each end of beam is terminated in tube orthogonal to axis of overhanging beam. Anchor bolt with washers and nuts interacting with butts of tubes from beneath and from above is passed through each tube. Beams are equipped with separable studs interjoining beams and meant to constrain column at moment of mounting. Each branch of column is provided with rests with milled lower butts intended to fix column by height. Overhanging beams are fitted with pockets fixing branches of column in plan. EFFECT: reduced usage of metal for column base, provision for adjustment-free mounting and alignment of building frame. 4 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
CONNECTION OF DOUBLE-BRANCH METAL COLUMN WITH FOUNDATION | 2001 |
|
RU2209880C2 |
PORTAL CRANE STRUCTURE | 2002 |
|
RU2235673C2 |
CRANE RUNWAY BEAM-TO-COLUMN CONNECTION UNIT | 1998 |
|
RU2188153C2 |
PROCEDURE RESTORING DESIGN POSITION OF SUNK COLUMN OF FRAME | 2000 |
|
RU2188278C2 |
CRANE BEAM-TO-COLUMN RIGID CONNECTION | 2002 |
|
RU2235676C2 |
JOINT FOR INTEGRATION OF FOUNDATION AND COLUMN | 2001 |
|
RU2209881C2 |
CRANE RUNWAY STRUCTURE | 2001 |
|
RU2227117C2 |
DEVICE FOR PREVENTION OF BREAKING AND STRAIGHTENING AND INCREASING CARRYING CAPACITY OF CRANE RUNWAY BEAM | 2001 |
|
RU2209760C2 |
FOUNDATION FOR ECCENTRIC LOADED COLUMN | 2002 |
|
RU2225480C2 |
FOUNDATION FOR METAL COLUMN, METHOD OF FOUNDATION CONSTRUCTION AND ALIGNMENT | 1995 |
|
RU2123091C1 |
Authors
Dates
2003-09-20—Published
2000-10-17—Filed