FIELD: construction of furnace installations for heat treatment of mineral raw material for production of cement clinker. SUBSTANCE: the installation has a rotating furnace and a vertical combustion chamber in the form of a sectional shaft provided with longitudinal walls and perforated walls of beams installed one above another and inlet and outlet cavities with floors adjoining them. The gas duct of the rotating furnace is connected to the sectional shaft and a cooler that is connected through an air conduit to the gas duct of the rotating furnace. The perforated walls of the sectional shaft are installed row upon row in parallel with one another. The inlet and outlet cavities are connected through windows in the longitudinal walls in turn with the gas duct of the rotating furnace and the gas ducts of gases outgoing from the sectional shaft. EFFECT: modified construction of the installation due to enhanced quality of the perforated walls and capacity. 7 cl, 5 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR HIGH-SPEED ROASTING OF MINERAL MATERIALS | 2001 |
|
RU2214571C2 |
METHOD AND INSTALLATION FOR MELTING MINERAL MATERIALS | 2002 |
|
RU2217503C2 |
PLANT FOR ROASTING GRANULAR MATERIALS | 1990 |
|
RU2024807C1 |
SECTIONAL SHAFT HEAT EXCHANGER | 2001 |
|
RU2220391C2 |
MINERAL ROAR MATERIAL KILNING PLANT | 0 |
|
SU1791683A1 |
SECTIONAL GRATE-FIRED FURNACE OF ACCELERATED COMBUSTION | 2001 |
|
RU2196934C1 |
METHOD OF DRYING FLUID AND SUSPENSION MATERIALS AND PLANT FOR REALIZATION OF THIS METHOD | 2001 |
|
RU2220389C2 |
INSTALLATION FOR ROASTING AND SINTERING OF MINERAL RAW MATERIAL | 2001 |
|
RU2214572C2 |
METHOD OF A TWO-STAGE CALCINATION OF THE GRANULAR AND GRAINED MATERIALS | 2001 |
|
RU2232362C2 |
METHOD FOR HIGH-SPEED MANUFACTURE OF ROASTING MOLDED PRODUCTS | 2001 |
|
RU2214574C2 |
Authors
Dates
2003-10-20—Published
2001-06-22—Filed