FIELD: procedure of heat treatment of various mineral materials in downcast filter bed. SUBSTANCE: the installation for roasting of lump material has a shaft provided with longitudinal walls and perforated walls, inlet and outlet cavities with floors and a partition demarcating the shaft into the furnace and the cooler. The installation is provided with self-contained gas ducts of air supply to the cooler and discharge of the outgoing gases from the furnace, hopper of raw material mix and a hopper of cooled product with feeder. Connected in the shaft to the inlet and outlet cavities are the perforated walls of beams installed one above another installed vertically by parallel rows, the longitudinal walls are made with windows connected by common gas ducts, and the self-contained gas ducts of the furnace and cooler are connected to the windows from the other side of the longitudinal walls. EFFECT: enhanced capacity, reduced capital investments and operating expenditures. 8 cl, 8 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR ROASTING AND SINTERING OF MINERAL RAW MATERIAL | 2001 |
|
RU2214572C2 |
INSTALLATION FOR TWO-STAGE ROASTING OF GRANULATED AND GRANULAR MATERIALS | 2001 |
|
RU2214570C2 |
SECTIONAL GRATE-FIRED FURNACE OF ACCELERATED COMBUSTION | 2001 |
|
RU2196934C1 |
SECTIONAL SHAFT HEAT EXCHANGER | 2001 |
|
RU2220391C2 |
METHOD OF DRYING FLUID AND SUSPENSION MATERIALS AND PLANT FOR REALIZATION OF THIS METHOD | 2001 |
|
RU2220389C2 |
METHOD AND INSTALLATION FOR MELTING MINERAL MATERIALS | 2002 |
|
RU2217503C2 |
METHOD FOR HIGH-SPEED MANUFACTURE OF ROASTING MOLDED PRODUCTS | 2001 |
|
RU2214574C2 |
PLANT FOR ROASTING GRANULAR MATERIALS | 1990 |
|
RU2024807C1 |
SHAFT COOLER WITH CROSS AIR FEED | 2001 |
|
RU2214573C2 |
SHAFT FURNACE WITH CROSS HEAT-TRANSFER AGENT FEED | 0 |
|
SU1791682A1 |
Authors
Dates
2003-10-20—Published
2001-06-22—Filed