FIELD: building, particularly cast-in-place building units, namely support structures.
SUBSTANCE: reinforced concrete column is formed in retained formwork and consists of upper support part and lower foundation part. Column includes reinforcement frame grouted with concrete mix and embedded members arranged in upper column part. Upper part of frame is located in retained formwork. Embedded members are in level with foundation slab marks and with flooring panel marks. Embedded members are formed as closed contours with stiffening ribs. Column is built in single- or multi-slot hollow. Projection of geometric retained formwork cross-section center coincides with that of lower reinforcement frame part. Arms of lower reinforcement form part extending in Y-axis direction are sized in accordance with given mathematical relation. Method of column erection involves forming single- or multi-slot hollow; producing reinforcement form with embedded members; forming retained formwork; installing above components; vertically placing the reinforcement frame in hollow so that frame is spaced a distance from hollow bottom; vertically adjusting and fixing upper column part to prevent transversal displacement thereof; grouting lower column part in bottom-top direction; grouting inner retained formwork area of upper column part. Hollow has dimensions measured in Y-axis direction determined from given relation.
EFFECT: possibility of simultaneous building erection in upward and downward directions relative ground level.
7 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
SCREW REINFORCED CONCRETE COLUMN AND BUILDING METHOD THEREOF | 2003 |
|
RU2229557C1 |
DRILLING REINFORCED CONCRETE COLUMN AND METHOD FOR ITS CONSTRUCTION | 2022 |
|
RU2798149C2 |
METHOD OF DRILLING REINFORCED CONCRETE COLUMN ERECTION | 2017 |
|
RU2674480C1 |
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION | 2016 |
|
RU2657885C2 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
UNIVERSAL HOUSE-BUILDING SYSTEM | 2014 |
|
RU2585330C2 |
METHOD OF ERECTING PILED FOUNDATION DESIGNED FOR HIGH LOADS | 2008 |
|
RU2375521C1 |
REINFORCED CONCRETE DIAMOND-SHAPED PILE-COLUMN OF INCREASED CARRYING CAPACITY | 2018 |
|
RU2681324C1 |
METHOD OF ERECTING FRAMEWORK FOR STRUCTURES | 2016 |
|
RU2618817C1 |
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
Authors
Dates
2005-05-10—Published
2003-11-12—Filed