FIELD: laying of oil pipelines.
SUBSTANCE: invention relates to construction and operation of oil pipelines in Northern areas in ice-loaded soils at nonuniform sagging. Oil main pipe line is laid in trench on supports connected to vertical pipes operating on thermosiphon principle. Holes are drilled in soil and pipe with hermetically sealed lower end face is lowered into hole. Upper end of pipe over snow cover is hermetically connected to tubular recuperative heat exchanger-condenser. Bracket-support for main pipeline is welded at trench bottom level to pipe, and upper half of pipe is thermally insulated. Inner spaces of device are evacuated and partially filled with low-boiling liquid, preferably, ammonia.
EFFECT: improved reliability of underground pipeline.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DRIVING A GAS MAIN IN MAN-MADE TRENCH AT PERMAFROST SOIL TERRITORY (VARIANTS) AND DEVICE FOR REALIZATION OF METHOD (VARIANTS) | 2006 |
|
RU2303736C1 |
PIPELINE COMBINED LAYING METHOD | 2006 |
|
RU2329428C2 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
METHOD FOR FASTENING UNDERGROUND PIPELINES IN MELTING PERMAFROST GROUNDS | 1988 |
|
SU1565186A1 |
ARCTIC WIND-DRIVEN POWER PLANT | 2020 |
|
RU2733683C1 |
METHOD OF LAYING PIPE LINE | 1989 |
|
RU2036365C1 |
METHOD OF LAYING PIPE LINE IN PERMAFROST GROUND | 1983 |
|
SU1137849A1 |
METHOD OF PIPELINE LAYING IN SWAMPY LOCALITY | 1996 |
|
RU2117846C1 |
METHOD OF LAYING UNDERGROUND PIPELINE IN SETTLEMENT SOILS (VERSIONS) | 2004 |
|
RU2249144C1 |
ARCTIC WIND-DRIVEN POWER PLANT | 2018 |
|
RU2688061C1 |
Authors
Dates
2004-10-10—Published
2003-01-09—Filed