FIELD: construction.
SUBSTANCE: invention relates to construction, particularly, to foundation engineering, and can be used in erection of rammed pile-shell. Method of erection of rammed pile-shell includes formation of well, installation of reinforcement frame in it, formation of barrel of pile-shell by supply of concrete mixture to well and compaction of its walls. In the lower part of the well there formed is the X-ray broadening. Simultaneously with sealing of walls of pile-shell, moisture is sucked from concrete mixture and soil under vacuum and electroosmosis phenomenon.
EFFECT: technical result consists in improvement of load-bearing capacity of stuffed pile-shell.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION | 2016 |
|
RU2657885C2 |
METHOD FOR MANUFACTURING A WIDENED CAST-IN-PLACE PILE | 2022 |
|
RU2795418C1 |
METHOD FOR CONSTRUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2087617C1 |
METHOD OF ARRANGING INJECTION PILE | 2016 |
|
RU2637002C1 |
METHOD OF PILE FORMING IN PRELIMINARY FORMED WELL | 2002 |
|
RU2231596C2 |
METHOD OF REINFORCEMENT OF FOUNDATIONS | 2008 |
|
RU2360071C1 |
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
GROUND ANCHOR OR DRILLING PILE AND MANUFACTURING METHOD OF GROUND ANCHOR OR DRILLING PILE | 2013 |
|
RU2543842C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD TO MANUFACTURE CAST-IN-PLACE PILES | 2011 |
|
RU2466239C1 |
Authors
Dates
2020-12-25—Published
2020-07-07—Filed