FIELD: well survey, particularly to survey wells drilled in multizone reservoir during operation thereof and to control well parameters without disturbing of well operation in flow or gas-lift modes or with the use of mechanized sucker rod pump or centrifugal pump.
SUBSTANCE: device comprises winch with borehole cable, wellhead equipment, land-based measuring system and borehole instrument assembly. The instrument assembly is made as measuring module system connected one to another in series through tube sections. Upper tube section is attached to bottom part of well product rising pipe through intermediate perforated chamber. Number of modules is equal to n-1, where n is number of productive reservoir zones of the well. In the case of well with increased wellhead pressure operation the intermediate perforated chamber is rigidly connected with bottom part of flow string. During mechanized well operation intermediate perforated chamber is secured to lower end of flow string under pump intake.
EFFECT: possibility of simultaneous control of all well parameters, increased reliability, possibility to obtain information from inclined, horizontal and inverse wells.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DOWN-HOLE TESTING AND MEASURING COMPLEX AND METHOD FOR ITS INSTALLATION IN HORIZONTAL WELL | 2012 |
|
RU2487238C1 |
METHOD FOR STUDYING DIRECTIVE AND HORIZONTAL WELLS DURING PUMPING OPERATION | 2023 |
|
RU2810764C1 |
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) | 2014 |
|
RU2571790C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION | 2014 |
|
RU2562641C2 |
METHOD OF DATAWARE AND CONTROL OF FLUID WITHDRAWAL FROM OIL WELLS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2341647C1 |
METHOD FOR PREVENTING DEPOSITS OF ASPHALT-RESINS AND PARAFFIN COMPONENTS OF OIL IN PUMP COMPRESSOR TUBES IN THE WELL AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2661951C1 |
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF | 2006 |
|
RU2345214C2 |
METHOD OF WELL COMPLETION, RESEARCH AND STIMULATION OF OIL-GAS INFLOWS AND DEVICE FOR ITS EMBODIMENT | 1998 |
|
RU2131023C1 |
DEVICE FOR HYDRODYNAMIC MONITORING OF WELLS | 2011 |
|
RU2471984C2 |
BOREHOLE UNIT WITH FIELD EXPLOITATION MONITORING AND CONTROL SYSTEM | 2014 |
|
RU2569390C1 |
Authors
Dates
2006-02-27—Published
2004-05-19—Filed