METHOD FOR WELL GAGGING BEFORE ELECTRIC SUBMERSIBLE PUMP LOWERING IN WELL Russian patent published in 2006 - IPC E21B7/08 E21B43/00 

Abstract RU 2274720 C2

FIELD: oil production industry, particularly well preparation to oil production equipment lowering.

SUBSTANCE: method involves lowering former including two sections rigidly connected one to another and adapter to simulate electric submersible pump size in well. Each section has dimension so that rings defining section diameter are split and are fixed with pins on larger section diameter in elastodeformed state. Independent measuring device is installed between the sections in hollow module. The independent measuring device meters former deformation in continuous mode when former moves through the full well bore and records and stores information in independent electronic unit. After obtained information decoding optimal electric submersible pump size, electric submersible pump lowering rate are determined and nonfailure operating time is predicted.

EFFECT: increased reliability and rate of well bore parameter measurements.

1 dwg

Similar patents RU2274720C2

Title Year Author Number
GEAR FOR TREATMENT AND EXAMINATION OF WELLS 2001
  • Chesnokov V.A.
  • Khasanov M.M.
RU2201502C2
METHOD OF BOREHOLE TRANSFER AND UNIT FOR TRANSFER OF LIQUID FROM UPPER WELL FORMATION TO LOWER ONE WITH FILTRATION 2011
  • Nagumanov Marat Mirsatovich
  • Aminev Marat Khusnullovich
  • Shamilov Faat Takhirovich
RU2485293C1
METHOD FOR STUDYING DIRECTIVE AND HORIZONTAL WELLS DURING PUMPING OPERATION 2023
  • Chudnovskij Aleksej Aleksandrovich
  • Chukhustov Aleksandr Dmitrievich
  • Shiryaev Evgenij Olegovich
  • Rybka Valerij Fedorovich
  • Kozhevnikov Igor Pavlovich
RU2810764C1
METHOD TO STRENGTHEN WELL AND DEVICE FOR ITS IMPLEMENTATION 2000
  • Studenskij M.N.
  • Kateev I.S.
  • Kateev R.I.
  • Maksimov V.N.
  • Gabdrakhimov M.S.
RU2190754C2
METHOD OF DRILLING INCLINED AND HORIZONTAL WELLS 1999
  • Basarygin Ju.M.
  • Budnikov V.F.
  • Geras'Kin V.G.
  • Dmitriev I.A.
  • Strel'Tsov V.M.
  • Sychev N.F.
  • Chernenko A.M.
  • Shabrov S.N.
RU2162520C1
METHOD OF OIL WITHDRAWAL FROM HIGH GAS CONTENT WELL AND ELECTROLOADING EQUIPMENT FOR IT 2007
  • Bakhir Sergej Jur'Evich
  • Latypov Tagir Mansurovich
  • Kosintsev Vasilij Vladimirovich
RU2380521C2
PROCEDURE FOR OPERATION OF WELL EQUIPPED WITH ELECTRO-CENTRIFUGAL PUMP PLANT WITH VARIABLE-FREQUENCY DRIVE 2010
  • Latypov Al'Bert Rifovich
  • Shajakberov Valerij Fajazovich
  • Ismagilov Rinat Rafaehlevich
  • Latypov Irek Abuzarovich
  • Shajakberov Ehduard Valer'Evich
RU2421605C1
METHOD OF OIL PRODUCTION FROM WELL 2011
  • Mazein Igor' Ivanovich
RU2455465C1
METHOD OF CORROSION PROTECTION OF SUBMERSIBLE PUMP UNIT BY LINING EXTERNAL SURFACE OF ASSEMBLIES THEREOF 2019
  • Baranov Nikita Aleksandrovich
  • Yudin Pavel Evgenevich
  • Maksimuk Andrej Viktorovich
  • Zheldak Maksim Vladimirovich
  • Petrov Sergej Stepanovich
  • Knyazeva Zhanna Valerevna
RU2734201C1
METHOD FOR STENCILING AND WORKING OUT A WELLBORE DURING GEOLOGICAL AND PHYSICAL RESEARCH IN AN OPEN HOLE 2022
  • Simonov Andrej Sergeevich
  • Khisamutdinov Maksim Albertovich
  • Akbashev Marsel Marsovich
  • Tikhonov Andrej Evgenevich
  • Fatikhov Vadim Valerevich
RU2790258C1

RU 2 274 720 C2

Authors

Gerasimov Anatolij Nikolaevich

Valeev Azamat Salavatovich

Zubarev Vladislav Petrovich

Gazarov Alenik Grigor'Evich

Dates

2006-04-20Published

2004-02-16Filed