FIELD: mining, particularly to develop flat-laying seams having incompetent rock roofs.
SUBSTANCE: method involves cutting mineral seam in chambers along with rock strips forming in the chambers and with safety mineral pillars leaving, wherein the rock strip is formed so that the rock strip remains behind chamber face and longitudinal axis thereof coincides with chamber axis; installing pneumatic cylinders on rock strip; laying timber supports on the pneumatic cylinders, wherein timber support height exceeds collapsed pneumatic cylinder height; removing pneumatic cylinders from rock strip after roof lowering in contact points between roof and timber supports. Minimal rock strip width exceeds pneumatic cylinder width and height thereof is determined from mathematical equation with taking into consideration seam thickness and initial pneumatic cylinder height after installation thereof.
EFFECT: increased output and reduced mineral mining losses due to increased chamber width.
2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMPOSITE FORMATIONS HAVING GOB LAYERS DEVELOPMENT | 2005 |
|
RU2281394C1 |
DEVELOPMENT METHOD FOR COMPOSITE SEAMS CHARACTERIZED BY GOB LAYERS | 2005 |
|
RU2276265C1 |
UNDERGROUND MINING METHOD OF FLAT BEDS OF MINERAL RESOURCES | 2007 |
|
RU2345220C1 |
MINING METHOD FOR COMPLEX SEAMS HAVING GOB INTERLAYERS | 2006 |
|
RU2309251C1 |
METHOD FOR UNDERGROUND FLAT-LAYING MINERAL SEAM MINING | 2006 |
|
RU2309250C1 |
DEVELOPMENT METHOD FOR COMPOSITE FORMATIONS HAVING GOB INTERLAYERS | 2005 |
|
RU2277170C1 |
DEVELOPMENT METHOD OF COMPOSITE BEDS WITH WASTE ROCK INTERLAYERS | 2007 |
|
RU2345218C1 |
METHOD FOR EXTRACTING A BED OF SHALE | 2005 |
|
RU2287686C1 |
ROOF CONTROL METHOD | 2005 |
|
RU2298100C1 |
METHOD FOR SAVING SECTIONS OF DEVELOPMENT WORKINGS | 1998 |
|
RU2134786C1 |
Authors
Dates
2006-05-10—Published
2005-02-16—Filed