FIELD: mining, particularly methods of underground mining.
SUBSTANCE: method involves cutting mineral seam in chambers along with rock strips erection in chambers and mineral rib pillars leaving; laying U-shaped boxes on seam ground so that the boxes are transversal to chamber ground and are behind chamber face line, wherein the U-shaped boxes have surface opened towards seam roof; filling the boxes with gob from complex seam interlayers for height determined from mathematical expression; covering U-shaped box filled with gob with next U-shaped one having greater dimensions and surface opened towards seam ground to create closed outline of the first layer; creating closed outline of the second layer on the first layer outline by arranging U-shaped boxes transversely to that of the first layer, wherein pneumocylinders are inserted in U-shaped boxes of second layers and have surfaces opened towards seam roof; closing pneumocylinders with U-shaped boxes having greater dimensions and surfaces opened towards ground; filling pneumicylinders with compressed air and expanding boxes of the first and the second layers between seam roof and ground; unloading and removing pneumocylinders after bringing the second layer pneumocylinders together under the action of rock pressure; laying wooden washers in place of pneumocylinders location.
EFFECT: increased performance and decreased mineral losses due to increased chamber width.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
MINING METHOD FOR COMPLEX SEAMS HAVING GOB INTERLAYERS | 2006 |
|
RU2309251C1 |
METHOD FOR UNDERGROUND FLAT SEAM MINING | 2005 |
|
RU2276264C1 |
METHOD FOR COMPOSITE FORMATIONS HAVING GOB LAYERS DEVELOPMENT | 2005 |
|
RU2281394C1 |
UNDERGROUND MINING METHOD OF FLAT BEDS OF MINERAL RESOURCES | 2007 |
|
RU2345220C1 |
DEVELOPMENT METHOD FOR COMPOSITE FORMATIONS HAVING GOB INTERLAYERS | 2005 |
|
RU2277170C1 |
DEVELOPMENT METHOD FOR COMPOSITE SEAMS CHARACTERIZED BY GOB LAYERS | 2005 |
|
RU2276265C1 |
DEVELOPMENT METHOD OF COMPOSITE BEDS WITH WASTE ROCK INTERLAYERS | 2007 |
|
RU2345218C1 |
METHOD OF WORKING A SUIT OF ADJOINING GENTLY-SLOPING MINERAL SEAMS | 0 |
|
SU950915A1 |
METHOD FOR EXTRACTING A BED OF SHALE | 2005 |
|
RU2287686C1 |
METHOD OF PREVENTION OF DEVELOPMENT ENTRIES IN COAL BED AREAS | 2007 |
|
RU2341657C1 |
Authors
Dates
2007-10-27—Published
2006-05-19—Filed