FIELD: building, particularly supporting structures for shuttering or frames for floors or roofs.
SUBSTANCE: device comprises load-bearing member adapted to support floor panel and arranged over floor panel plane. The load-bearing member is connected with floor panel by means of tie member. Method for floor panel erection with the use of above device involves installing form for floor panel forming; connecting upper tie end with load-bearing member over floor panel; arranging lower tie end at floor panel height; pouring concrete; stripping form and erecting next layer after previously formed floor panel hardening; removing tie after floor panel strength increase to obtain strength enough for panel self-supporting.
EFFECT: increased capacity and floor panel quality.
14 cl, 22 dwg
Authors
Dates
2006-08-10—Published
2003-01-24—Filed