FIELD: oil extraction, in particular, engineering of devices using during inter-well gas-lifting operations.
SUBSTANCE: device contains lifting pipe column with throttle and two packers with circulation valves, mounted above perforation interval of gas head and perforation interval of oil level. In accordance to invention it is additionally provided by external pipes column, concentric relatively to lifting pipes column, containing aforementioned packer with circulation valve. It is mounted above perforation interval of gas head. Cylindrical cone is made on lower end, which provides for gravitational precipitation of sand grains in gas flow. In its zone, throttle is positioned on lifting pipes column. Lifting pipes column is longer than external pipes column for value, equal to gas head perforation interval. Device has disconnecting piece, positioned under the throttle.
EFFECT: expanded functional capabilities due to restoration of circulation in case when maintenance, washing, stopping or launching of well are necessary, and also prevented blockage of throttle.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SIMULTANEOUS-SEPARATE DEVELOPMENT OF SEVERAL PRODUCTIVE FORMATIONS AND WELL UNIT FOR METHOD EMBODIMENT | 2001 |
|
RU2211311C2 |
PROCEDURE FOR SIMULTANEOUS OPERATION OF SEVERAL OBJECTS IN PRODUCER AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2438008C1 |
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION | 2020 |
|
RU2756650C1 |
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL | 2003 |
|
RU2262586C2 |
DEVICE AND SYSTEM (VERSIONS) FOR INCREASE OF LIQUID RECOVERY FROM UNDERGROUND BEDS | 1997 |
|
RU2196892C2 |
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS | 2003 |
|
RU2253009C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF SEVERAL PAYOUT BEDS AND INSTALLATION OF WELL FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2334867C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2017 |
|
RU2669950C1 |
SEPARATE MAINTENANCE PROCESS FOR INJECTION OR PRODUCTION WELL AND IMPLEMENTATION VARIANTS | 2006 |
|
RU2328590C1 |
METHOD OF LIFTING WELL FLUID AND COMBINED WELL LIFT FOR REALIZATION OF THIS METHOD | 1999 |
|
RU2160853C1 |
Authors
Dates
2006-10-10—Published
2004-12-30—Filed