FIELD: shipbuilding; building of nuclear submarines.
SUBSTANCE: proposed method of building single-hulled submarine consists in erection of separate parts and modules. Unified parts of pressure hull are adopted from double-hulled submarine of previous series of ships. Internal frames mounted inside pressure watertight shell of hull between respective external frames are rigidly connected with shell, after which external frames are cut-off and remaining tails are used for securing the sound-insulating coat of shell.
EFFECT: reduction of labor input; reduced building time.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SUBMARINE AND METHOD FOR ITS CONSTRUCTION | 2006 |
|
RU2343085C2 |
COMBINED LATERAL BRANCH PIPE | 2006 |
|
RU2332324C1 |
METHOD OF EVACUATING CABIN CREW FROM DISABLED SUBMARINE AND DEVICE TO THIS END | 2005 |
|
RU2346849C2 |
METHOD AND DEVICE FOR PATCHING BREACHES IN TWO-HULL UNDER WATER STRUCTURE | 2011 |
|
RU2470824C1 |
QUASAR METHOD OF BREAK-UP OF NUCLEAR SUBMARINES (VERSIONS) | 2000 |
|
RU2205767C2 |
NUCLEAR SUBMARINE | 2012 |
|
RU2494004C1 |
SUBMARINE AFT EXTREMITY | 2000 |
|
RU2166456C1 |
NUCLEAR SUBMARINE AND MARINE-VERSION LIQUID-PROPELLANT ROCKET ENGINE | 2012 |
|
RU2488517C1 |
BURIAL SARCOPHAGUS FOR SUNK NUCLEAR SUBMARINE | 1994 |
|
RU2081464C1 |
DEEP WATER UUV WITH LARGE DISPLACEMENT OF SUPER-LARGE INDEPENDENCE WITH COMBINED METHOD OF CONNECTING MODULES OF HOUSING STRUCTURE | 2019 |
|
RU2725945C1 |
Authors
Dates
2008-04-10—Published
2006-04-04—Filed