FIELD: mining.
SUBSTANCE: method involves drilling vertical injection wells and horizontal producing wells, injection of working agent via injection wells and oil withdrawal via production wells. Horizontal hole of production well is arranged 1.5-2.5 m above the productive stratum bottom and is perforated. Bottom of vertical injection well is arranged 3.5-4.5 m above the horizontal hole of producing well and is perforated at 0.5-1.5 m interval from the bottom. The distance between vertical injection well and the vertical hole of producing well is longer than 2/3 of horizontal producing well length up to the end of horizontal hole. Working agent is steam alternating with air.
EFFECT: increased oil yield of a pool.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2007 |
|
RU2334098C1 |
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2007 |
|
RU2334097C1 |
METHOD TO DEVELOP STICKY OIL AND BITUMEN ACCUMULATION | 2009 |
|
RU2387820C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT USING FLOODING | 2012 |
|
RU2504646C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494241C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT | 2010 |
|
RU2434127C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494240C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMEN | 2012 |
|
RU2496000C1 |
METHOD OF DEVELOPING OIL POOL USING HORIZONTAL MULTIBRANCH WELLS | 2012 |
|
RU2505668C1 |
METHOD OF SUPER-VISCOUS OIL FIELD DEVELOPMENT | 2018 |
|
RU2678739C1 |
Authors
Dates
2008-09-20—Published
2007-09-24—Filed