FIELD: mining.
SUBSTANCE: method involves positioning injection wells between production wells at the distance of 30-250 m between wells. Injection well bottom is positioned at 5-7 m distance from productive formation bottom. Production well bottom is positioned at 0.5-1.5 m distance from productive formation bottom. The wells are perforated at 0.6-1.0 m interval from the bottom. Steam alternated with air is used as heat carrier. Heat carrier is pumped over injection wells, and oil is withdrawn over production wells.
EFFECT: increased oil yield of a pool.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2007 |
|
RU2334095C1 |
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2007 |
|
RU2334098C1 |
METHOD TO DEVELOP STICKY OIL AND BITUMEN ACCUMULATION | 2009 |
|
RU2387820C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494241C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMEN | 2012 |
|
RU2496000C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494240C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT | 2010 |
|
RU2434127C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT USING FLOODING | 2012 |
|
RU2504646C1 |
DEVELOPMENT METHOD OF SUPER-VISCOUS OIL DEPOSIT | 2018 |
|
RU2695206C1 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL AND BITUMEN DEPOSIT | 2011 |
|
RU2483206C1 |
Authors
Dates
2008-09-20—Published
2007-09-24—Filed