FIELD: mining.
SUBSTANCE: method involves drilling vertical injection wells and horizontal production wells. Steam alternated with air is injected over injection wells, and oil is withdrawn over production wells. Horizontal holes of two production wells are positioned at the same line towards each other, their ends close to each other. Horizontal holes pass 1.5-2.5 m above the productive stratum bottom and are perforated. The bottom of vertical injection well perforated at 0.5-1.5 m interval from the bottom is positioned 3.5-4.5 m higher than the horizontal hole ends of production wells. Horizontal holes of the two other horizontal wells with the same parametres and similar injection well position are arranged parallel to horizontal hole line of the two production wells to form parallel withdrawal and working agent injection lines.
EFFECT: increased oil yield of a pool.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2007 |
|
RU2334095C1 |
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2007 |
|
RU2334097C1 |
METHOD TO DEVELOP STICKY OIL AND BITUMEN ACCUMULATION | 2009 |
|
RU2387820C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT | 2010 |
|
RU2434127C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494241C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT USING FLOODING | 2012 |
|
RU2504646C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494240C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMEN | 2012 |
|
RU2496000C1 |
METHOD OF SUPER-VISCOUS OIL FIELD DEVELOPMENT | 2018 |
|
RU2678739C1 |
METHOD OF DEVELOPING OIL POOL USING HORIZONTAL MULTIBRANCH WELLS | 2012 |
|
RU2505668C1 |
Authors
Dates
2008-09-20—Published
2007-09-24—Filed