FIELD: engines and pumps.
SUBSTANCE: loose material classifier incorporates intake bin, running cylindrical shafts fitted to form a sizing slit, sized material receptacles. The aforesaid shafts represent and upper shaft integrated with a drum, a pusher intended for preventing the sizing slit clogging and a power shat with a feed drum, both shafts running in one direction. The upper shaft runs 2 to 3 times faster than the lower one. To allow material move along the slit and to prevent clogging the later, the drums are furnished with multi-start threads with slot width making b=(3-4)l, where l is the slot length and depth making h= (0.3 to 0.5)l. The angle formed by the horizontal pane and the shafts axes plane varies from 30 to 60 degrees.
EFFECT: higher efficiency of sizing and lower wear of components.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR DUMP AND REGULATION OF WITHDRAWAL DEPTH FROM HOLDING BASIN | 2006 |
|
RU2334047C2 |
MATERIALS DEHYDRATOR | 2010 |
|
RU2447946C2 |
DEVICE TO PURIFY SERVICE WATER OF SUSPENDED PARTICLES | 2006 |
|
RU2345815C2 |
PROCESS WATER TREATMENT INSTALLATION FOR REMOVAL OF SUSPENDED PARTICLES | 2006 |
|
RU2329851C2 |
TAPER-RING-GUARD DEVICE TO DEHYDRATE LOOSE MATERIALS | 2007 |
|
RU2361824C2 |
METHOD FOR TREATMENT OF PROCESS WATERS | 2006 |
|
RU2342326C2 |
DEVICE FOR DEHYDRATION OF LOOSE MATERIALS | 2007 |
|
RU2362744C2 |
DEVELOPMENT METHOD OF GENTLY SLOPING AND INCLINED COAL BEDS OF VARIOUS CONFIGURATION AND HYPSOMETRY, WHICH ARE COMPLICATED WITH MINING-AND-GEOLOGICAL INTERRUPTIONS | 2009 |
|
RU2391509C1 |
METHOD FOR RAILWAY GRID ASSEMBLING USING STABLE CONCRETE SLEEPERS | 2007 |
|
RU2335592C1 |
METHOD OF WASTE WATER TREATMENT | 2006 |
|
RU2355642C2 |
Authors
Dates
2008-12-20—Published
2006-11-28—Filed