FIELD: metallurgy.
SUBSTANCE: gas-outlet route contains hood, gas flue, fabric collector with bin for dust, outfitted by system of dust discharge with driver, smoke exhaust and chimney. Route is outfitted by emergency valve; bin for dust is outfitted by vibrator and sensors of top and bottom levels of dust. Dust discharge system driver is outfitted by sensor of power consumption. Smoke exhaust is outfitted by position sensing apparatus. Vibrator is connected to sensor of power consumption of dust discharge system driver, and dust discharge system driver is connected to sensors of top and bottom levels of dust smoke exhaust position sensing apparatus. On the body of fabric collector it is installed emergency valve. Emergency valve is outfitted by damper with sealing element, jointed and cargo compression unit, at that in damper there are implemented windows with floated covers and sealing elements.
EFFECT: reliability growth of operating and improving of service conditions, expansion of manufacturing capability and application scope.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
GAS OUTLET CHANNEL FOR STEEL MAKING UNIT | 2016 |
|
RU2609588C1 |
CLEANING AND COOLING METHOD OF PROCESS GAS OF ARC STEEL-MAKING FURNACE | 2011 |
|
RU2464512C1 |
OXYGEN CONVERTER GAS-OUTLET CIRCUIT | 2005 |
|
RU2288279C1 |
METHOD OF GAS DEDUSTING AND IMPLEMENTATION DEVICE | 2006 |
|
RU2339437C2 |
UNIT TO ENTRAP AND CLEAN GAS EMISSIONS FROM PROCESSING EQUIPMENT | 2009 |
|
RU2440174C2 |
INSTALLATION FOR RECOVERY AND TREATMENT OF GAS EMISSIONS FROM PROCESS EQUIPMENT | 2009 |
|
RU2416651C1 |
PROCESS GAS BURSTS TREATMENT AND RECOVERY PLANT | 2009 |
|
RU2420342C2 |
INSTALLATION FOR THERMAL PROCESSING OF WASTE | 2017 |
|
RU2666559C1 |
AGGLOMERATE HEAT RECOVERY APPARATUS | 1998 |
|
RU2151809C1 |
CLEANING METHOD OF EXHAUST GASES OF MINE HEAT-TREATING FURNACES AND PLANT FOR ITS IMPLEMENTATION | 2007 |
|
RU2360197C1 |
Authors
Dates
2009-01-10—Published
2007-02-02—Filed