METHOD OF FOUNDATION BED CONSTRUCTION BY HORIZONTAL REINFORCING WITH SOLID CONCRETE COMPONENTS Russian patent published in 2009 - IPC E02D27/01 

Abstract RU 2344232 C1

FIELD: construction.

SUBSTANCE: invention relates to foundation construction technologies, and particularly, to reinforcing technology used for compressible foundation sections of detached or standard foundations in buildings and structures being erected under severe engineering and geological and hydro-geological conditions. Method of foundation bed construction by horizontal reinforcing with solid concrete components includes foundation pit mining and installation of horizontal stiff lengthy elements such as crossties. As soon as the foundation pit is developed to the designed depth, which is equal to the sum of foundation bed depth of installation and buffer layer thickness, and is bladed, foundation pit bottom is leveled. After that, foundation axes are broken down and longitudinal axes of future solid crossties are broken down against the established construction layout of the longitudinal axes of future solid crossties regarding foundation axes. The chaps for solid crossties are made mechanically or manually on foundation pit bottom along the marked longitudinal axis of the future solid crossties. Besides, the chap depth is equal to the cross section of the future solid crosstie. The chap bottom is cleaned and reinforced frameworks are laid down in the chaps. The chaps are then cemented together with the reinforced frameworks by means of concrete mix B15 with further compacting. To install horizontal reinforced solid elements in the chaps such as solid crossties are located on the foundation pit level. So, the crosstie distributing element is formed in the compressible section of the built structure foundation bed. In addition, the length of each solid crosstie must not exceed the distance between the external shapes of the utmost foundation edges of the building. The chaps for solid crossties installation are made in parallel to each other and at design distance from each other so that the area of crosstie distributing element overlaps foundations area completely. As soon as the concrete mix in the chaps will achieve the strength no less than 50% from the design strength, the buffer layer is laid down, leveled and compacted. The buffer layer is laid down to the level of built structure foundation bed. The buffer layer consists of sand, crushed stone from solid rocks or crushed stone from ferrous metallurgy wastes. The buffer layer thickness must not be less than 1/3 of solid crosstie width or cross section diameter. The maximum size of crushed stones must not exceed 1/5 solid crosstie width or cross section diameter.

EFFECT: improvement of soft ground foundations bearing capacity and reduction of material consumption.

4 dwg

Similar patents RU2344232C1

Title Year Author Number
METHOD OF FOUNDATION BED CONSTRUCTION BY HORIZONTAL REINFORCING WITH PRECAST CONCRETE COMPONENTS 2007
  • Saurin Anatolij Nikiforovich
  • Il'Ichev Vjacheslav Aleksandrovich
  • Zhadanovskij Boris Vasil'Evich
  • Kuznetsova Ekaterina Anatol'Evna
  • Saurin Jaroslav Anatol'Evich
  • Red'Kina Julija Vjacheslavovna
  • Miljutin Denis Nikolaevich
RU2344231C1
METHOD TO ARRANGE BASE OF STRUCTURAL FOUNDATIONS 2012
  • Saurin Anatolij Nikiforovich
  • Il'Ichev Vjacheslav Aleksandrovich
  • Saurin Jaroslav Anatol'Evich
RU2496944C1
METHOD FOR RECOVERY OF EXHAUSTED OPEN PITS FOR CONSTRUCTION OF STRUCTURES 2009
  • Boldyrev Oleg Valentinovich
  • Mukhortov Vasilij Vasil'Evich
  • Neljubin Igor' Viktorovich
  • Olejnik Sergej Pavlovich
RU2387837C1
METHOD OF DANGEROUS AND RECONSTRUCT ABLE BUILDING FOUNDATIONS REINFORCEMENT 2002
  • Saurin A.N.
  • Bagdasarov Ju.A.
  • Zhadanovskij B.V.
  • Firsov A.N.
  • Karavashkin N.N.
RU2229562C1
METHOD OF RECOVERING BARROW PITS FOR COSTRUCTING VARIOUS STRUCTURES 2007
  • Boldyrev Oleg Valentinovich
  • Neljubin Igor' Viktorovich
  • Mukhortov Vasilij Vasil'Evich
  • Nemtsev Petr Sergeevich
  • Morozov Gennadij Sergeevich
  • Olejnik Sergej Pavlovich
RU2354830C1
METHOD OF MANUFACTURING OF BEARING COMBINED REINFORCED IN SITU PILE 2007
  • Saurin Anatolij Nikiforovich
  • Il'Ichev Vjacheslav Aleksandrovich
  • Zhadanovskij Boris Vasil'Evich
  • Saurin Jaroslav Anatol'Evich
  • Red'Kina Julija Vjacheslavovna
  • Miljutin Denis Nikolaevich
RU2334048C1
METHOD OF COMBINED IN SITU PILE MANUFACTURING 2007
  • Saurin Anatolij Nikoforovich
  • Il'Ichev Vjacheslav Aleksandrovich
  • Zhadanovskij Boris Vasil'Evich
  • Saurin Jaroslav Anatol'Evich
  • Red'Kina Julija Vjacheslavovna
  • Miljutin Denis Nikolaevich
RU2334049C1
METHOD OF CAST-IN-PLACE PILE CONSTRUCTION OUT OF SOIL AND SLAG MIX WITH SOLIDIFICATION ACTIVATING AGENT IN EXPANDED WELLS 2007
  • Saurin Anatolij Nikiforovich
  • Il'Ichev Vjacheslav Aleksandrovich
  • Zhadanovskij Boris Vasil'Evich
  • Saurin Jaroslav Anatol'Evich
  • Red'Kina Julija Vjacheslavovna
  • Miljutin Denis Nikolaevich
RU2354780C1
METHOD OF MANUFACTURING OF CHIPPING IN SITU PILE 2007
  • Saurin Anatolij Nikiforovich
  • Il'Ichev Vjacheslav Aleksandrovich
  • Zhadanovskij Boris Vasil'Evich
  • Saurin Jaroslav Anatol'Evich
  • Red'Kina Julija Vjacheslavovna
  • Miljutin Denis Nikolaevich
RU2338032C1
METHOD TO ARRANGE REINFORCEMENT-CONVERTING CONCRETE-CAST BORED CAST-IN-PLACE PILES WITH EXPANSIONS IN WEAK WATERLOGGED SOILS 2012
  • Saurin Anatolij Nikiforovich
  • Il'Ichev Vjacheslav Aleksandrovich
  • Saurin Jaroslav Anatol'Evich
RU2506371C1

RU 2 344 232 C1

Authors

Saurin Anatolij Nikiforovich

Il'Ichev Vjacheslav Aleksandrovich

Zhadanovskij Boris Vasil'Evich

Kuznetsova Ekaterina Anatol'Evna

Saurin Jaroslav Anatol'Evich

Red'Kina Julija Vjacheslavovna

Miljutin Denis Nikolaevich

Dates

2009-01-20Published

2007-12-03Filed