METHOD FOR ARRANGEMENT OF PILE FOUNDATIONS FOR STRUCTURES, PILE FOUNDATIONS AND SHELL STRUCTURE FOR CREATION OF WIDENED FOOT Russian patent published in 2009 - IPC E02D5/44 

Abstract RU 2346112 C2

FIELD: construction.

SUBSTANCE: invention is related to methods for arrangement of pile foundations for structures, to pile foundations and shell structure for creation of widened foot for pile foundations. Method for creation of pile foundation for structures, according to which the following stages are executed on site to arrange the mentioned foundation - well for installation of foundation pipe is drilled with the help of the first auger drill. The following section is drilled under lower end of installed foundation pipe. Cavity is arranged in the specified section by means of scraper and pressure of water jet. Loose soil is removed from specified cavity by mentioned first drill. Pipe for set of tools and accessories with the second auger drill and flexible shell that envelopes the lower part of the second specified drill is lowered through foundation pipe into lower part of specified section. Excess pressure is built up in specified shell, and moulding material is injected into specified cavity, surplus of which is then removed by the second auger drill. After mentioned material hardens, the specified shell is blown off and removed via specified foundation pipe. Reinforcing device is lowered into foundation pipe. Concrete material is poured into foundation pipe, at that specified cavity is filled, and specified reinforcing device is embedded into concrete, thus creating widened foot for foundation pipe. Versions of method and pile foundation are also stated.

EFFECT: higher stability and resistance to compressing and stretching forces, lower material intensity.

5 cl, 26 dwg

Similar patents RU2346112C2

Title Year Author Number
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION 2011
  • Akatov Vjacheslav Pavlovich
  • Akatov Maksim Vjacheslavovich
  • Dankovtsev Aleksandr Fedorovich
  • Pudeev Pavel Vasil'Evich
  • Smirnov Aleksandr Jur'Evich
  • Politiko Dmitrij Leonidovich
  • Fedorashko Nikolaj Vasil'Evich
RU2492294C1
SINGLE-PILE-SLABBY FOUNDATION 2016
  • Borozenets Leonid Mikhajlovich
  • Mishin Semen Alekseevich
  • Gurskij Vitalij Vladimirovich
RU2638664C2
INJECTION PILE AND RETAINING WALL BUILT OF PILE FOUNDATION 2004
  • Vasjukevich Leonid Jul'Evich
  • Stotsenko Aleksej Aleksandrovich
RU2281997C2
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) 2008
  • Eremin Valerij Jakovlevich
  • Budanov Aleksej Aleksandrovich
  • Eremin Aleksej Valer'Evich
  • Rajanov Sergej Fadusovich
  • Siguta Jurij Vasil'Evich
  • Tikhonov Mikhail Sergeevich
RU2385384C1
PILE FOUNDATION AND A METHOD TO ERECT IT 1991
  • Shadunts K.Sh.
  • Kirichkov E.V.
RU2026922C1
METHOD OF BUILDING OF PILE FOUNDATION AND PILE FOUNDATION 2007
  • Kruglov Valerij Mikhajlovich
  • Zenin Aleksandr Viktorovich
  • Vylitok Aleksandr Vasil'Evich
RU2348759C2
PILE FOUNDATION 0
  • Tetior Aleksandr Nikanorovich
  • Redkin Viktor Ivanovich
SU922236A2
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION 2008
  • Shadunts Konstantin Shagenovich
  • Marinichev Maksim Borisovich
RU2378454C1
PILE FOUNDATION ERECTION METHOD 2007
  • Fedorchenko Aleksandr Ignat'Evich
  • Vauchskij Nikolaj Pavlovich
RU2349709C1
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION 2010
  • Dmitrienko Aleksej Gennadievich
  • Glukhov Vjacheslav Sergeevich
  • Shirmanov Aleksandr Aleksandrovich
  • Suchkov Sergej Aleksandrovich
  • Murakaev Il'Nur Marsovich
RU2436899C1

RU 2 346 112 C2

Authors

Rasmussen Khening Baltser

Dates

2009-02-10Published

2004-08-30Filed