FIELD: construction.
SUBSTANCE: invention concerns construction industry, in particular restoration of corrosion-damaged reinforced-concrete cantilevers of industrial buildings without interrupting the manufacturing process. The deteriorating reinforced-concrete cantilever is unloaded of eccentric support pressures of adjacent gantry beams joined together and bending the cantilever. Unloading is carried out using a symmetric pair of T-shaped balancers with three levers: Left, right and central facing downward. Right pair of levers is brought under the adjacent pair of gantry beams. Left pair of levers is attached using hangers to a centering balance placed on a low modular pad and interacting with the top edge of the cantilever. A pair of central levers is connected using horizontal rods to a stop located under the deteriorating cantilever. Nuts on the horizontal rods of the pair of T-shaped balancers are tightened underneath and the adjacent gantry levers are jacked upwards by the right levers of this pair. While taking up the vertical support pressure of the two gantry beams, the pair of T-shaped balancers transfers the support pressure from the right lever to the left one and through the hangers to the centering balance.
EFFECT: complete unloading of column cantilevers that have lost their capacity as a result of concrete and reinforcement corrosion without interrupting the manufacturing process, and adjustment of gantry structures.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO UNLOAD EMERGENCY REINFORCED CONCRETE CANTILEVER THAT EXHAUSTED ITS BEARING CAPACITY AS RESULT OF CONCRETE AND REINFORCEMENT CORROSION | 2008 |
|
RU2415239C2 |
METHOD TO RECOVER BEARING CAPACITY OF PILLARS OF REINFORCED CONCRETE SYMMETRICAL CANTILEVERS THAT ARE DAMAGED IN MIDDLE ROW | 2010 |
|
RU2477776C2 |
METHOD FOR COMPLETE UNLOADING OF REINFORCED CONCRETE CANTILEVER OF COLUMN AGAINST ACTION OF CRANE BEAMS | 2011 |
|
RU2469948C2 |
METHOD OF DAMPING OVERHEAD CRANE EFFECTS AND UNLOADING REINFORCED-CONCRETE SUPPORT OF COLUMN DISINTEGRATING FROM CONCRETE REINFORCEMENT CORROSION | 2010 |
|
RU2457998C2 |
METHOD OF COMPLETE RELIEF OF COLUMN REINFORCED CONCRETE CANTILEVER | 2011 |
|
RU2496709C2 |
CANTILEVER OF REINFORCED CONCRETE COLUMN | 2002 |
|
RU2233955C2 |
METHOD OF COMPLETE RECOVERY OF SERVICEABILITY OF DANGEROUS COLUMN REINFORCED CANTILEVER TAKING UP BEARING REACTIONS OF ADJACENT CRANE GIRDERS | 2012 |
|
RU2496708C2 |
CRANE RUNWAY STRENGTHENING METHOD | 1994 |
|
RU2114045C1 |
METHOD TO CONTROL STRESSED STATE OF DOUBLE-SPAN BUILDING FRAME WITH THE USE OF FOUNDATIONS WITH JET ENGINES | 2005 |
|
RU2319811C2 |
DOUBLE-SPAN BUILDING FRAME | 2005 |
|
RU2319817C2 |
Authors
Dates
2009-02-20—Published
2006-04-17—Filed