FIELD: soil cultivation.
SUBSTANCE: method consists in creating excessive damping of surface of milled field. Also complete near-bottom peat layer is preliminary removed; further there are successively performed topographic surveying, mapping of elevations, geographic mapping followed with geological mapping and hydro-geological boring; after that part of layer of mineral sediments is cut off; its thickness is calculated by mathematic formula.
EFFECT: renewal of peat bog generation process on worked out fields of peat production for a shorter period of time.
1 tbl, 10 dwg
Authors
Dates
2009-06-27—Published
2008-02-07—Filed