FIELD: construction.
SUBSTANCE: invention is related to the field of construction and may be used in reconstruction of steel vertical cylindrical reservoirs. Method includes reservoir cutting by long cut into two equal semi-cylindrical parts, which are serially turned relative to initial position by portion of required common angle of mutual turn, which does not exceed 180°, and in space produced, bottom section is installed together with identical semi-cylindrical wall shells with radius equal to initial one. In points of shell connections, stands are installed on separate foundations, then roof is finished.
EFFECT: possibility of any required increase of reservoir capacity and rational use of area of adjacent land lots.
3 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD TO INCREASE VERTICAL CYLINDRICAL STEEL RESERVOIR CAPACITY | 2006 |
|
RU2310728C1 |
| METHOD TO INCREASE STEEL VERTICAL CYLINDRICAL TANK CAPACITY | 2006 |
|
RU2322561C1 |
| ERECTION METHOD FOR FORMING RESERVOIR WITH DOME-LIKE ROOF IN TOP-DOWN CONSTRUCTION MANNER AND DEVICE FOR ERECTION METHOD IMPLEMENTATION | 2003 |
|
RU2259453C2 |
| VERTICAL CYLINDRICAL RESERVOIR FOR CRUDE OIL AND OIL PRODUCTS | 1991 |
|
RU2022112C1 |
| RESERVOIR FOR STORAGE OF CRYOGENIC LIQUIDS | 2008 |
|
RU2430295C2 |
| CYLINDER-SHAPED RESERVOIR FOR OIL PRODUCTS STORAGE | 2007 |
|
RU2348576C1 |
| METHOD FOR INCREASING NUMBER OF STOREYS IN BUILDING | 1994 |
|
RU2081981C1 |
| LIQUEFIED NATURAL GAS STORAGE TANK | 2024 |
|
RU2824699C1 |
| METHOD OF ERECTING A BUILDING OF MONOLITHIC CONCRETE | 0 |
|
SU1052635A1 |
| EARTHQUAKEPROOF MONOLITHIC CONCRETE STOREHOUSE | 2000 |
|
RU2180033C2 |
Authors
Dates
2009-07-20—Published
2008-01-28—Filed