FIELD: heating.
SUBSTANCE: raw humid material is loaded via charging chute 6 into aggregate 4 for drying in pseudo-liquefied layer, and pseudo-liquefied layer 7 is formed by ascending gas flow created by high temperature gas fed from bottom part of the aggregate 4 for drying in pseudo-liquefied layer. Raw humid material is discharged through discharging chute 8. Part of high temperature gas is supplied over first bypass pipe 9 branching from gas main 2 to space close to gas outlet 5 in top part of the aggregate 4 for drying in pseudo-liquefied layer. Part of high temperature gas is blown over second bypass pipe 11 branching from the first bypass pipe 9 to the charging chute 6.
EFFECT: prevented sticking or sedimentation of raw humid material to charging chute.
8 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
FLUIDISED BED DRIER AND DRYING METHOD OF WET RAW MATERIAL USING FLUIDISED BED DRIER | 2006 |
|
RU2352879C1 |
METHOD OF MELTING CAST IRON AND CUPOLA FOR PERFORMING THE SAME | 0 |
|
SU1788403A1 |
METAL MELT PRODUCTION APPARATUS AND METHOD (VERSIONS) | 1998 |
|
RU2205878C2 |
METHOD FOR PRODUCING CAST IRON | 2016 |
|
RU2644866C2 |
BLAST FURNACE OPERATION METHOD AND LANCE | 2014 |
|
RU2674454C2 |
DRYING PLANT FOR HUMID RAW MATERIALS AND METHOD OF DRYING HUMID RAW MATERIALS | 2006 |
|
RU2373256C2 |
METHOD OF INJECTION OF ALTERNATIVE REDUCING AGENTS INTO THE BLAST FURNACE | 2015 |
|
RU2671024C2 |
APPARATUS FOR RECIRCULATION OF SECONDARY SLIME IN CAST IRON PRODUCTION SYSTEM | 2002 |
|
RU2248401C2 |
BLAST FURNACE OPERATION METHOD | 2014 |
|
RU2674374C2 |
METHOD OF PRODUCING LIQUID IRON OR LIQUID STEEL SEMIPRODUCTS AND PLANT FOR ITS EMBODIMENT | 1996 |
|
RU2133780C1 |
Authors
Dates
2009-09-10—Published
2006-02-17—Filed