FIELD: process engineering.
SUBSTANCE: proposed method comprises injecting fluid into scrubber (3) in countercurrent to gas at several levels. Note here that gas is forced through at least two inlets (2) made in scrubber housing. To reduce difference in gas contact interval, gas is directed, nearby inlets (2), inside scrubber with its diametre equal or larger than 12 m, in particular, exceeding 20 m to make two gas flows intercrossing there inside at section from scrubber center to half its radius behind the scrubber center.
EFFECT: higher intensity of interaction between gas and fluid.
6 cl, 12 dwg
Title | Year | Author | Number |
---|---|---|---|
WET-TYPE INSTALLATION FOR FLUE GAS DESULPHURIZATION | 1994 |
|
RU2124932C1 |
DEVICE AND METHOD OF HARMFUL SUBSTANCE ABSORPTION FROM GASES | 2009 |
|
RU2514957C2 |
ENTRAINMENT SEPARATOR FOR GASES MOVING AT HIGH VELOCITIES AND FOR REPEATED HEATING OF SCRUBBER GASES | 1995 |
|
RU2149050C1 |
ANNULAR SCRUBBER WITH ANNULAR INJECTION | 2012 |
|
RU2602880C2 |
METHOD FOR CONDENSATION OF WATER VAPOR FORMED DURING CATALYTIC COMBUSTION OF SLUDGE FROM MUNICIPAL WASTEWATER TREATMENT PLANTS | 2020 |
|
RU2752176C1 |
DEVICE AND METHODS FOR COOLING AND CLEANING HEATED EXHAUST GASES | 2020 |
|
RU2748332C1 |
WET SCRUBBER FOR OFFGAS CLEANING | 2012 |
|
RU2556664C2 |
DEVICE AND PROCESS USED FOR RESTORING FLUORINE FROM SMOKE AFTER PHOSPHORUS ABSORPTION BY HYDRATION IN BURNING PROCESS IN FURNACE FOR PRODUCING PHOSPHORIC ACID | 2013 |
|
RU2638982C2 |
FURNACE INSTALLATION AND FURNACE GAS REINING METHOD | 2017 |
|
RU2746617C2 |
DEVICE AND METHOD OF SMOKE FUMES | 2008 |
|
RU2459655C2 |
Authors
Dates
2009-12-27—Published
2005-10-21—Filed