FIELD: construction.
SUBSTANCE: method for erection of slab-pile foundation includes arrangement of piling field and mattress. Piles are submerged along foundation perimetre, and mattress is produced of two parts - external one, having upward ledges and directly resting on piles, and internal one - with downward ledges, which rests on the external part. At the same time as rated settlement is achieved, external and internal parts of mattress are rigidly joined, thus providing for combined operation of slab-pile foundation.
EFFECT: reduced material intensity, improved bearing capacity of foundation.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT PILED RAFTS | 2013 |
|
RU2548461C1 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD OF SECURING WEAK SOIL AT THE BASE OF A FOUNDATION SLAB | 2023 |
|
RU2807344C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD | 2015 |
|
RU2667163C2 |
SLAB-AND-PILE FOUNDATION | 2005 |
|
RU2301303C2 |
METHOD FOR CONSTRUCTION OF PILE-PLATE FOUNDATION | 2021 |
|
RU2774443C1 |
METHOD TO RECOVER CONTACT LAYER "FOUNDATION - SOIL BASE" | 2015 |
|
RU2572477C1 |
METHOD FOR PILE-AND-SLAB FOUNDATION CONSTRUCTION IN SEISMIC AREAS | 2005 |
|
RU2300604C1 |
METHOD OF INDUSTRIAL BUILDING FOUNDATION CONSTRUCTION | 2003 |
|
RU2244067C1 |
Authors
Dates
2010-01-20—Published
2008-08-14—Filed